Hi, JoAnn.
The idea behind the stage 3 review is that TC members look at a
whole, complete proposal. Part of their job is to ensure that the
proposal include everything it needs, also to review new topics
and changes to existing topics before the TC takes a look at them.
Happy reviewers then "stand" with the proposal owner as champions
during the TC discussion and vote
I assumed you were looking for a 2nd review for the following
reasons:
- The subcommittee has added new content (albeit small) to the
proposal since it was first reviewed.
- The package in Kavi only includes source files.
If the subcommittee wants to move this directly to the stage 3
discussion phase, please upload the following to Kavi and send
an e-mail to the list:
- A "built" version of the proposal. This can be a single HTML
file or PDF or CHM or whatever.
- A zip of DITA source that is in sync with the "built"
proposal
Best,
Kris
Kristen James Eberlein
Principal consultant, Eberlein Consulting
Co-chair, OASIS DITA Technical Committee
Charter member, OASIS DITA Adoption Committee
www.eberleinconsulting.com
+1 919 682-2290; kriseberlein (skype)
On 6/10/2013 9:16 PM, JoAnn Hackos wrote:
Kris,
These have already been reviewed. Are we reviewing everyone
twice?
JoAnn
Sent from my iPad
JoAnn Hackos
Comtech Services Inc
710 Kipling Street Suite 400
Lakewood CO 80215
Hi, Stan.
I'll add them to the agenda.
I assume that you are looking for reviewers since the
earlier packages weren't complete?
Best,
Kris
Kristen James Eberlein
Principal consultant, Eberlein Consulting
Co-chair, OASIS DITA Technical Committee
Charter member, OASIS DITA Adoption Committee
www.eberleinconsulting.com
+1 919 682-2290; kriseberlein (skype)
On 6/10/2013 8:14 PM, Stan Doherty wrote:
Hi --
At the TechComm SC meeting earlier today, the SC
reviewed outstanding updates to the three Stage 3
proposals for troubleshooting elements. Bob has uploaded
the supporting files to the OASIS repository. Great job
Bob!!
At the earliest opportunity, we'd love to have these
Stage 3 proposals reviewed by the TC.
Is there any chance that we could get on the TC
agenda for tomorrow (06/11/2013)??
Many thanks --
Stan
P.S. I have updated Trello for these items.
---------- Original Message ----------
From: Robert Thomas
<bob.thomas@tagsmiths.com>
To:
dita-techcomm@lists.oasis-open.org
Date: June 10, 2013 at 12:43 PM
Subject: [dita-techcomm] Groups - Supporting file s for
proposals 13086, 13096, 13097, and 13098 uploaded
Submitter's message
This is the same .zip that went to the list on 09jun13.
-- Mr. Robert Thomas
Document Name:
Supporting
files for proposals 13086, 13096, 13097, and
13098
Description
13086, step troubleshooting, is in phase 3
13096, task troubleshooting, is in phase 3
13097, troubleshooting topic, is entering phase 2
13098, note type-attribute value trouble, is in
phase 3
Download
Latest Revision
Public
Download Link
Submitter: Mr. Robert Thomas
Group: DITA Technical
Communication SC
Folder: Standards
Date submitted: 2013-06-10
09:43:49
|
Stan Doherty
Director, Technical Publications
Verivue Inc.
---------------------------------------------------------------------
To unsubscribe from this mail list, you must leave the OASIS
TC that generates this mail. Follow this link to all your TCs
in OASIS at:
https://www.oasis-open.org/apps/org/workgroup/portal/my_workgroups.php
|