[Date Prev] | [Thread Prev] | [Thread Next] | [Date Next] -- [Date Index] | [Thread Index] | [List Home]
Subject: NotesOnCommitteeNoteApproval
Hi All, You can read the complete Information about
Committee Note Approval process at the following url: https://www.oasis-open.org/policies-guidelines/tc-process Committee Notes are treated as another OASIS
Work Product. These are all excerpts relating to Committee Notes. ·
"Committee Note" is a
Non-Standards
Track Work Product that has been approved by a Technical Committee
as specified
in Section
3.0. ·
"Committee Note Draft" is a
Non-Standards
Track Work Product approved by a Technical Committee as specified
in Section
3.1. ·
"Committee Note Public Review Draft"
is a
Committee Note Draft that has been approved by the TC to go to
public review as
specified in Section
3.2 of this Process. "Non-Standards
Track
Work Product" is a Work Product produced and approved by a
TC in
accordance with the TC Process which may be progressed to Committee Note
as described
in Section
3. Non-Standards Track Work Products are intended to be
informative and
explanatory in nature. They are not subject to the patent
licensing and
non-assertion obligations requirements of the OASIS IPR Policy. "OASIS
Deliverable" means any of the following: Committee
Specification
Drafts, Committee Specification Public Review Drafts, Committee
Specifications,
Candidate OASIS Standards, OASIS Standards, Approved Errata, Committee Note
Drafts, Committee
Note Public Review Drafts,
and Committee Notes. "OASIS Deliverable" means any of the following:
Committee Specification Drafts, Committee Specification Public
Review Drafts,
Committee Specifications, Candidate OASIS Standards, OASIS
Standards, Approved
Errata, Committee
Note Drafts,
Committee Note
Public Review
Drafts, and Committee Notes. "Work Product
Ballot" is any TC ballot for the:
"Working
Draft"
is a preliminary version of a Work Product produced by one or more
TC Members
that has not yet been voted on by the TC and approved as a
Committee
Specification Draft or a Committee
Note. Some examples are initial contributions and
revisions made by
editors or other TC Members. Announcements:
The OASIS TC
Administrator shall create a publicly archived list for
announcements from the
OASIS TC Administrator regarding TCs. Any Eligible Person shall be
able to
subscribe to this list. Every important change in TC status shall
be posted to
the announcement list; such changes shall include but not be
limited to the
following: TC formation; TC Charter revision; start of Public
Review; approval
of Committee Specifications and Committee Notes; submission of a Committee
Specification as a
Candidate OASIS Standard; approval or rejection of a proposed
OASIS Standard;
and closure of a TC. (6) Allowed changes. Any change made to a Work
Product
requires a new version or revision number, except for changes made
to (a) the
approval status, (b) the date, (c) the URIs of the Work Product as
appropriate,
(d) the running header/footer, (e) updates to the file names of
all Work
Product files and any references between them, (f) any approved
Designated
Cross-Reference Changes, or (g) when a Committee Specification is
approved as
an OASIS Standard, and prior to its publication, any references to
a Committee
Specification may be updated if the referenced Committee
Specification has
subsequently been approved and published as an OASIS Standard. All
of 6(a-g)
must be made after the approval of the Work Product as a Committee
Specification Draft, Committee
Note, Committee Specification, Candidate OASIS Standard,
or OASIS
Standard and before its official publication by TC Administration. Non-Standards Track Work Products may directly be approved as Committee Notes
by the
Technical Committees via a Full Majority vote. Public reviews are optional for Committee Notes. If a TC wishes to conduct public
reviews before
approving a Committee
Note,
the same procedures for approving a Committee Specification (as
outlined in
section 3.1, section 3.2 and section 3.3) and a similar
terminology used for
the intermediate drafts of the Committee Specifications (i.e. Committee Note Draft
and Committee
Note Public Review Draft) must be followed. Note that a Committee
Note
is never progressed as an OASIS standard. After approving a Committee
Note, a Technical Committee may notify the TC
Administrator for
publishing the Committee
Note
to the OASIS Library and announcing its publication to the OASIS
membership. So, what this all means is that we are not required to hold a
Special
Majority Vote as I thought we were. A simple Full Majority Vote,
without the
need for electronic oversight, is allowable. So when we meet on 9
July 2013. We
can vote it out of the SC and vote it on to Committee Note
Publication the
following Tuesday at the EM Adoption TC, though I would prefer
getting a nod
from the EM TC. -- Rex Brooks GeoAddress: 1361-A Addison Berkeley, CA 94702 Phone: 510-898-0670 |
[Date Prev] | [Thread Prev] | [Thread Next] | [Date Next] -- [Date Index] | [Thread Index] | [List Home]