emergency-msg message
[Date Prev]
| [Thread Prev]
| [Thread Next]
| [Date Next]
--
[Date Index]
| [Thread Index]
| [List Home]
Subject: Meeting Notes/Minutes for Dec. 27, 2008
- From: Rex Brooks <rexb@starbourne.com>
- To: emergency-msg@lists.oasis-open.org
- Date: Sun, 30 Dec 2007 11:46:47 -0800
Title: Meeting Notes/Minutes for Dec. 27,
2008
Hi Everyone,
I thought it was important to post Meeting Notes/Minutes of our
meeting 27 December 2007, since we are preparing for a face-to-face
meeting to finish the EDXL-RM Specification for its second 60-Day
Public Review. This will include information about the Revision that
is being prepared for the face-to-face. I'm including the minutes in
the body of this message as well as posting it separately to the SC
document repository.
As always, corrections, comments and suggestions are
welcome.
Cheers,
Rex
EM-Msg Meeting Dec. 27, 2007 Minutes
Roll:
Rex Brooks,
Gary Ham
Werner Joerg,
Alessandro Triglia
Agenda:
1 We briefly reviewed Section 1.3 to address the issue Rex
brought up with regard to the use of the word 'segment' to refer to
the specific messages because it sounds as if it is a technical term
with some specific definition that could be expected to be found in
the data dictionary. Rex suggested that the term 'unit' would be a
suitable replacement, and Gary suggested the term 'part." We
chose to replace 'segment' with 'part.'
2 The editiorial changes recommended by Tim in Section 1.3 are
included in the face-to-face revision, as well as the replacement of
"Conditional" statements with "Provisional"
statements recommended by Tim.
3 The editorial changes recommended by Tim in Section 1.1 are
not included in the face-to-face revision, so the file with Tim's
recommendations (EDXL-RM-CD-v1.0-Revision-006-2TG) will need to be
reviewed so that we can discuss and decide whether to include those
recommendations in the final specification for the TC vote.
4 We discussed the remaining and on-going division of tasks for
the face to face and reviewed the assignments:
- Gary will review the Schemas and make recommendations. If these
can be included in the revision for the face-to-face, Rex will do
that. Gary will also review the Contact Information issues with regard
to the import of the CIQ v.3.0 specification;
- Alessandro will review the geo-oasis solution developed for
EDXL-HAVE and we will be ready to implement these measures on site in
the face-to-face. Because not all of the SC worked on the EDXL-HAVE
solution, we need to confirm this in the face-to-face.
5 We discussed the issue of a Conformance Section, and Rex
took the action item to compile a list of the Conformance Statements
from the Specification and will share them with Alessandro so that
they can develop a Conformance Section for the face to face that we
can discuss on site, decide upon and include in the final revision of
the specification for a TC vote on moving to a second 60-Day Public
Review. this will be a separate document.
6 For the purpose of readability and access, Rex will prepare
and upload two versions of the revision for the face-to-face along
with Tim's edit in a Zipped set:
- A clean version with all corrections accepted for readability
(EDXL-RM-CD-v1.0-Revision-007-cln);
- The Document of Record (EDXL-RM-CD-v1.0-Revision-007) the complete
"Redline" version necessary for the submission to OASIS that
documents all changes resulting from the first 60-Day Public Review.;
- Tim's recommendations (EDXL-RM-CD-v1.0-Revision-006-2TG)
7 Werner will have "Enterprise Architect" on his
laptop for our use in the face-to-face in case we need to make changes
to the diagrams and Tim will provide a laptop with the specification
revision loaded and ready for final edits during the face-to-face.
The meeting adjourned.
--
Rex Brooks
President, CEO
Starbourne Communications Design
GeoAddress: 1361-A Addison
Berkeley, CA 94702
Tel: 510-898-0670
[Date Prev]
| [Thread Prev]
| [Thread Next]
| [Date Next]
--
[Date Index]
| [Thread Index]
| [List Home]