[Date Prev] | [Thread Prev] | [Thread Next] | [Date Next] -- [Date Index] | [Thread Index] | [List Home]
Subject: [OASIS Issue Tracker] Created: (EMIX-394) CLONE -Omnibus for SharonDinges issues from PR
CLONE -Omnibus for Sharon Dinges issues from PR ----------------------------------------------- Key: EMIX-394 URL: http://tools.oasis-open.org/issues/browse/EMIX-394 Project: OASIS Energy Market Information Exchange (eMIX) TC Issue Type: Improvement Components: spec Affects Versions: csprd02 Public Review Draft Reporter: Toby Considine Assignee: Anne Hendry Subject: [emix] Comments on emix-v1.0-csprd02 From: "Dinges, Sharon" <sdinges@trane.com> Date: Fri, 20 May 2011 14:42:29 +0000 To: "emix@lists.oasis-open.org" <emix@lists.oasis-open.org> Great job to the primary authors - this is a great specification. Here are my suggested changes: [Editor: add ~212 to dinges #s to get .odt numbers (may be diff #s when converted back)] 259: Suggest changing to: "... by one Party to another Party" Ed. (s/b 471 in .odt, but is instead 440) Done. 372: Suggest changing to: "... can be offered..." Ed. (574) Done. 453: change "therefor" to "therefore" Ed. (665) Done 454: change "has is" to "is" - for Minimum Recovery Duration and Minimum Duration Between Invocations Ed. (666) Done 454: (throughout document, actually) - adhere to consistent use of the period (.) punctuation mark in tables, bullets, etc. Ed. (666) *** tbd at last pass 454: Why do Availability Schedule and Unavailability Schedule have identical definitions - I would expect a slight difference Ed. (666) Done. Also see Jira issue 389 on definition of 'Schedule'. 473: suggest changing to: "... meter, an aggregation..." Ed. (687) Done 479: suggest changing to: "... Purchase Order, on each..." Ed. (695) Done. 489: existing wording not clear: "... not include quantity or precise." Ed. (707) Done. 492: suggest changing from "This illustration" to "Figure 6-1" (since it is on the following page) Ed. (710) Done. 507, 512: Change comma to a period Ed. (728, 734) Done 510: add space to: "Table 4-1describe" Ed. (731) Done. 513: Product Description: change "nor" to "not" Ed. (735) Done. 515: suggest changing to: "... Sequence as a temporally..." Ed. (737) Done. 519: existing wording not clear for Relation: "... one Interval to other..." Ed. (Table 7, line 742, Relation) *** Need better definition. Add to list. Cannot find 'relation' in schema. Cannot find 'unit price' in schema. Table needs some context. Doesn't make sense as it is. 531: change to: "Electrical energy and must..." Ed. (755) Done. 537: existing wording not clear: "... could be brought market..." Ed. (763) Done. 548: add colon after "that" Ed. (774) Done. 549a: revise to be consistent with 762: "energy = power * duration" Ed. (775) Done. 551: change "with in" to "within" Ed. (778) Done. 575: Price Relative: change wording to: "... and of a..." Ed. (807) Done. 590: Price - change from "... choice one of a Price..." to "... choice of either Price..." Ed. (825) Done. 590, 599: Energy Units - revise description to read: "Denominates the units to which the Price applies." Ed. (825, 835) Done. 599: Block Energy Price: revise wording to read: "... Quantify and the price for the next..." Ed. (835) Done. 603 616: (and throughout), standardizes on "TeMIX" rather than "TEMIX" Ed. Done. 603: remove extra period at end of sentence Ed. (840) Done. 608: change "intervals" to "interval" Ed. (845) Done. 612, 790: (throughout) Energy Item equation - why is this "Time" rather than duration, as in 549? Make consistent throughout, if appropriate Ed. (849 - Energy Item) Removed these equations as they are superflous. Done. 623, 624: Revise to read: "One charge can be applied to each of the products as above, so is defined here. That charge is the Demand Charge, as defined below:" Ed. (861,862) Done. 625: Measurement Interval: change to "Granularity of Power Use..." Ed. (863 - Measurement) Done. 625: What is the right term: "floor", Demand Charge Floor", "Demand Floor" - it is used in three different ways in this table... make consistent Ed. (863 - table 9) Done as per comment. 633: Full Requirements Power: "Demand Charges" is an incomplete thought... Ed. (872 - Table 9) Deleted. Done. 633: Full Requirements Power Maximum and Minimum: existing wording not clear: "... draw energy at least the minimum rate" Ed. (872 - Table 9) Done. 633: Hourly Day Ahead Pricing: change to "Full Requirements Power" Ed. (872 - Table 9) Done. 634: add period to end of sentence Ed. (872 - Table 9) Done. 676, 683: (and elsewhere in document): standardize on the use of either "min" or "minutes" but, do not mix the units Ed. (921, 922) Done. 678: change to: "... as above, to capabilities..." Ed. (923) Done. 683: change from "100MW" to "100 MW" Ed. (929) Done. 703: Constraints - change from "below" to "in Table 10-2" Ed. (953 - constraints) Done. 710: Staging Ramp and Recovery Ramp: change to "An array of Power..." Ed. (961) Done. 736: change to something like: "... many markets, they Offer Curves..." Ed. (993) Done. 787: clean up the "Error!" reference Ed. (1052 - 1053) *** Document creation/processing error needs fixing. Is highlighted in RED. 792: Strike Price: - where is "Option Writer" defined? Ed. (1057 - table 11) *** Also mentioned in Option Holder element definition. Either need to stop referring to 'Option Writer' (find other term to refer to other side) or define it. If it's not needed as an element in the schema, then delete? Otherwise add to schema. 792: Granularity - change from "at10:00" to "at 10:00" Ed. (1057 - table 11) Done. 820: Power Frequency - change from "Powr Quality" to "Power Quality" Ed. (1089 Table 13) Done. 834: Transport Loss Factor - modify parantheses to match Conversion Loss Factor: "Loss Factor * purchase amount = delivered amount). Also, throughout the document, be consistent in what is on the left side of each equation, and what is on the right side - both methods are used. Ed. (1106 - Table 14) Removed such equations. Done. 867: change "Conformance" to "conformance", unless there is a deliberate reason for the capitalization Ed. (1146) Done. 875: add period to end of sentence Ed. (1156) Done. Regards, - Sharon Sharon E. Dinges, CEM System Applications Engineer; Smart Grid Standards Initiatives Lead l Desk: 651.407.4244 l mobile:763.954.0469 sdinges@trane.com l Trane - Ingersoll Rand Climate Solutions l 4833 White Bear Pkwy, St. Paul, MN 55110 The information contained in this message is privileged and intended only for the recipients named. If the reader is not a representative of the intended recipient, any review, dissemination or copying of this message or the information it contains is prohibited. If you have received this message in error, please immediately notify the sender, and delete the original message and attachments. -- This message is automatically generated by JIRA. - If you think it was sent incorrectly contact one of the administrators: http://tools.oasis-open.org/issues/secure/Administrators.jspa - For more information on JIRA, see: http://www.atlassian.com/software/jira
[Date Prev] | [Thread Prev] | [Thread Next] | [Date Next] -- [Date Index] | [Thread Index] | [List Home]