Subject: Action items
Hi all, Here’s the first cut at the action items for the
contractor. Feel free to comment prolifically. J The current action item of the sub committee is to develop a cost model
for PKI. The principal mechanism to accomplish this is a survey which will be
administered within the TC first and then taken to a larger audience outside of
OASIS. Following a list of activities to be contracted out in support of this
effort: -
Draft the survey Work with the sub committee members to draft a survey.
The sub committee will approve the survey before the survey is conducted. -
Survey Phase 1 TC members will be the target of the first phase. The
contractor will conduct the survey with all willing TC members. -
Phase 1 analysis The contractor will provide analysis of the survey
results and coordinate feedback from the TC on the survey itself. -
Refine the Survey The contractor will edit and refine the survey based
on the feedback from the TC, the analysis of the phase 1 results, and guidance
from the sub committee. -
Identify second phase targets The contractor will coordinate input from the TC as to
likely candidates for the second phase survey. The subcommittee will approve
the final list. -
Survey Phase 2 The contractor will conduct the survey with the -
Report analysis of results The contractor will report analysis of the results to
the sub committee in a format suitable for reporting to the TC. |