[Date Prev] | [Thread Prev] | [Thread Next] | [Date Next] -- [Date Index] | [Thread Index] | [List Home]
Subject: Minutes of Atlantic UBL TC call 8 February 2012
MINUTES OF ATLANTIC UBL TC MEETING WEDNESDAY 8 FEBRUARY 2012 ATTENDANCE Jon Bosak (chair) G. Ken Holman Andy Schoka STANDING ITEMS Additions to the calendar: http://ubl.xml.org/events None. Review of Pacific call minutes No comments. PSC DELIVERABLES See below. TSC DELIVERABLES AS: Audun has sent revised example instances, though some of the content is generated with dummy values from OxygenXML. GKH: After hand-correction of a couple of typos, these have been incorporated into this morning's SGTG package (see below). AS: But as an effect of the large-scale changes to DocumentStatusRequest, we now have a few more minor TSC issues. SGTG DELIVERABLES See http://lists.oasis-open.org/archives/ubl/201202/msg00010.html Many thanks to G. Ken Holman for his work in wrapping up this draft before he starts his Leave of Absence. GKH: The message also lists issues for TSC and a reminder for PSC. Note that the schemas in Draft2 (linked above) can be used to test instances. If Audun discovers the need for a new code value in working to create real-world sample instances, we can revise the code list to contain the new value. JB: We will pick up the changes when GKH returns in March. Priorities for work to be done in his absence: 0. New TSC issues: resolve ASAP 1. Issues identified in the message linked above: PSC: Resolve the issue with Row 13 of Receipt Advice, correct in eDoCreator TSC: Correct the capitalization of Code in Transportation Status and Transportation Status Request in eDoCreator; correct the sample instances 2. Documentation-related materials PSC: Revise process diagrams and provide descriptive prose for the new cancellation document, including appropriate new business rule(s); be sure to provide all diagrams as EA files TSC: Revise illustrations and descriptive prose to reflect changes since PRD2; be sure to provide all diagrams as EA files The goal is to have these materials in hand in time to allow a preliminary PRD3 package to be prepared for internal review to take place before GKH returns. The diagrams require extensive handwork using various software tools, making their incorporation into the hubdoc extremely time-intensive, so revised diagrams must be submitted in the next week or so if we are to have a hope of completing a test package in time for an internal review. TC CONCALL SCHEDULE Week of 2012.02.13 Regular schedule Week of 2012.02.20 Regular schedule Week of 2012.02.27 Regular schedule Week of 2012.03.05 Regular schedule Week of 2012.03.12 Regular schedule Week of 2012.03.19 Regular schedule Week of 2012.03.26 Regular schedule Note that GKH will be on leave of absence from 8 February until the week of 19 March. Jon Bosak Chair, OASIS UBL TC ================================================================== TRACKING ITEMS NDR WORK ACTION (2012.01.04): GKH to combine his previous analysis with BH's work to make a straw man for review. Pending. NDR CHECK (NIST TOOL) On hold while working on NDR revision. UBL 2.1 NDR ILLUSTRATIONS UBL 2.0 NDR IMPLEMENTATION GUIDE WIKI http://wiki.oasis-open.org/ubl/NDR_2.0_Implementation_Guide CCTS 2.01 DMR ACTION (2009.06.30): TM to circulate a draft CCTS 2.01 DMR to the TC for review. Pending.
[Date Prev] | [Thread Prev] | [Thread Next] | [Date Next] -- [Date Index] | [Thread Index] | [List Home]