[Date Prev] | [Thread Prev] | [Thread Next] | [Date Next] -- [Date Index] | [Thread Index] | [List Home]
Subject: WS-TX 1.2 designated cross references
[WSTrust] WS-Trust 1.4, http://docs.oasis-open.org/ws-sx/ws-trust/200802
[WSCOOR] Web Services Coordination (WS-Coordination) 1.2, http://docs.oasis-open.org/ws-tx/wscoor/2006/06, OASIS, January 2008
we should instead say:
[WSTrust] OASIS Committee Draft 01, WS-Trust 1.4, http://docs.oasis-open.org/ws-sx/ws-trust/200802, June 2008
[WSCOOR] OASIS
Public Review Draft, Web Services Coordination
(WS-Coordination) 1.2, http://docs.oasis-open.org/ws-tx/wscoor/2006/06,
May 2008
At Committee spec stage, our internal
cross-references will be to other committee specifications but we might
still refer to WS-Trust 1.4 Public Review Draft. We would have a ballot
to approve CS drafts without any designated cross-reference changes
and to advance to OASIS Standard with designated cross-reference
changes.
If the OS member ballot passed but the
referenced spec (e.g. WS-Trust) lagged by 4 months then during that 4 month
period the published latest version of WS-TX would be the CS but would
automatically be replaced by an OS containing the changed cross references
once the referenced specs were finalized.
Regards,
Ian Robinson
Unless stated otherwise above:
IBM United Kingdom Limited - Registered in England and Wales with number
741598.
Registered office: PO Box 41, North Harbour, Portsmouth, Hampshire PO6
3AU
S/MIME Cryptographic Signature
[Date Prev] | [Thread Prev] | [Thread Next] | [Date Next] -- [Date Index] | [Thread Index] | [List Home]