Folks - After much hand-wringing and confusion I think we're ready to kick the EDXL-HAVE 2.0 spec into high gear. I have a goal of having it ready for the next stage by the end of November.
Rex will hopefully be available to join us.
I'll have Zoom running as well for us to do some screen-sharing since there are so many tickets in JIRA right now. I will try to go through them all and add comments about whether we are going to respectfully ignore, or act (and what the action may be) on each of these.
cheers,
Darrell
--
Darrell O'Donnell, P.Eng.
OASIS EM-TC - Member
OASIS EM-TC HAVE SC - Co-Chair