[Date Prev] | [Thread Prev] | [Thread Next] | [Date Next] -- [Date Index] | [Thread Index] | [List Home]
Subject: RE: Quality Product
EIS-A SRS has a section on quality with some parameters. This information is based upon power quality events defined within IEEE 1159-2009. A 298 Service Level Agreement (SLA) between a and an electrical energy provider should be 299 based on an agreed upon number of transients, sags, voltage fluctuations, voltage dips 300 and interruptions, voltage imbalances, power-frequency variations, induced low 301 frequency voltages, and CD in AC networks events defined in the IEEE 1159 standard. 302 A placeholder was added to this information to indicate Quality of Service (QOS), similar 303 to the Availability found in telephony/data systems. In the future we expect the industry 304 to create a metric that defines--"good power", power availability, or Quality of Service. 305 The Power Quality information exchanged across the ESI is defined in Table 2.1. 306 Properties Data Types Units Transients / Billing Period ULong n/a Sags / Billing Period ULong n/a Swells / Billing Period ULong n/a Interruptions / Billing Period ULong n/a Voltage Imbalances / Billing Period ULong n/a power frequency variations / Billing Period ULong n/a Others (See IEEE-1159) / Billing Period ULong n/a Quality of Service PerCent % Table 2.1 Power Quality Information ________________________________________ From: Considine, Toby (Campus Services IT) [Toby.Considine@unc.edu] Sent: Thursday, May 13, 2010 5:40 AM To: emix@lists.oasis-open.org Subject: [emix] Quality Product Where does quality fit in Emix? For sake of conversation Restrict Emix to simple Load Leave out the performance classes for a moment Don’t worry about DR. Now we have a simple purchase of 1 KWh of 120 volt 3 phase 60 Hz A/C for one hour. - I can offer it - I can buy it - I can get it - My meter can record it If the voltage sags for five minutes in the middle has it been delivered or not? How about 45 minutes? If it is out of phase has it been delivered or not? How much has it been out of phase? Is a closure event failure to deliver? The answer is of course “It Depends” Or the long form, “It Depends on what’s in the contract” But how do we specify the quality for the contract… tc ________________________________ "If something is not worth doing, it`s not worth doing well" Peter Drucker ________________________________ Toby Considine Chair, OASIS oBIX Technical Committee Co-Chair, OASIS Technical Advisory Board Facilities Technology Office University of North Carolina Chapel Hill, NC Email: Toby.Considine@ unc.edu<mailto:Toby.Considine@fac.unc.edu> Phone: (919)962-9073 http://www.oasis-open.org blog: www.NewDaedalus.com
[Date Prev] | [Thread Prev] | [Thread Next] | [Date Next] -- [Date Index] | [Thread Index] | [List Home]