[Date Prev] | [Thread Prev] | [Thread Next] | [Date Next] -- [Date Index] | [Thread Index] | [List Home]
Subject: [OASIS Issue Tracker] Updated: (EMIX-519) Flicker SummaryMeasurements are incorrect
[ http://tools.oasis-open.org/issues/browse/EMIX-519?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ] William Cox updated EMIX-519: ----------------------------- Proposal: Correct the specification at line 1165 Table 16-3, Figure 16-3, and the schema to describe the type of both flickerPlt and flickerPst as float. The description should be "A measurement of [long term][short term] Rapid Voltage Change. The actual periods for measurement are defined in the measurement protocol documents." Also table 16-2 line 1159, change "A described in" to "As described in" and "61000+2003}" to "61000-2003" was: Correct the specification at line 1165 Table 16-3, Figure 16-3, and the schema to describe the type of both flickerPlt and flickerPst as float. The description should be "A measurement of [long term][short term] Rapid Voltage Change. The actual periods for measurement are defined in the measurement protocol documents." > Flicker Summary Measurements are incorrect > ------------------------------------------ > > Key: EMIX-519 > URL: http://tools.oasis-open.org/issues/browse/EMIX-519 > Project: OASIS Energy Market Information Exchange (eMIX) TC > Issue Type: Sub-task > Affects Versions: CSD03/PR03 > Environment: Marty Burns PR03 Comments > Reporter: William Cox > Assignee: William Cox > > See http://lists.oasis-open.org/archives/emix-comment/201108/msg00002.html for full original email. > All, > Below please find comments on the definition of flicker measurements. As indicated by Erich, there is no such thing as a flicker count as related in Table 16-3 Power Quality Indicators (line 1165). Rather, these are floating point dimensionless quantities interpreted roughly as a figure of merit with a value of 1.0 that value where 50% of people would notice it in an incandescent light bulb. > It is suggested that the definitions be modified accordingly. -- This message is automatically generated by JIRA. - If you think it was sent incorrectly contact one of the administrators: http://tools.oasis-open.org/issues/secure/Administrators.jspa - For more information on JIRA, see: http://www.atlassian.com/software/jira
[Date Prev] | [Thread Prev] | [Thread Next] | [Date Next] -- [Date Index] | [Thread Index] | [List Home]