[Date Prev] | [Thread Prev] | [Thread Next] | [Date Next] -- [Date Index] | [Thread Index] | [List Home]
Subject: [OASIS Issue Tracker] (EMIX-543) Cardinality of power:powerItem and power:energyItem in Offer Curves
Toby Considine created EMIX-543: ----------------------------------- Summary: Cardinality of power:powerItem and power:energyItem in Offer Curves Key: EMIX-543 URL: https://issues.oasis-open.org/browse/EMIX-543 Project: OASIS Energy Market Information Exchange (eMIX) TC Issue Type: Improvement Components: schema Affects Versions: CS02 Environment: Steve Ray Reporter: Toby Considine Assignee: William Cox Priority: Minor Section 13.6.2 Offer Curves (line 1056): Please consider the cardinality of power:powerItem and power:energyItem. Should both be mandatory? Conformance should require at least one if they are optional. Should optionality be included in the specification? -- This message was sent by Atlassian JIRA (v6.2.2#6258)
[Date Prev] | [Thread Prev] | [Thread Next] | [Date Next] -- [Date Index] | [Thread Index] | [List Home]