Subject: Standing Bids
There is a number of different things that seem to be the same: 1. in the case of a level 1 Grid Integrity event, I have a mandatory requirement to turn off half of everything; if I fail to do so, the grid has the right to disconnect my meter 2. in the case of a level 2 Grid Integrity event, I have a mandatory requirement to turn off everything; if I fail to do so, the grid has the right to disconnect my meter 3. in the case of a “Code Lavender”, I agree to shed half my power. By participating in Lavender Events, I receive access to the discounted prices all the time 4. If you offer me a dollar, I will always shed a KW 5. If you offer me two, I will shed another KW else as well. 6. I have 25 other KWs that I would be willing to haggle over 7. I could perform some other defined acts if we haggle We are calling only 4 & 5 “standing bids”, but I cannot tell the difference between them—I think they are all the same thing. Each of them has a size of load or a process to implement. WE could opt to shed the defined processes from the list to simplify. Each may have a lead time specified. Each may have time or date limits on the offering, as opposed to the transaction This approach also has the advantage that is makes an [office park] configured as a microgrid to very easily aggregate responses from the buildings configured as microgrids that it contains. We could call them Offerings. Or something else as specified. - tc "If something is not worth doing, it`s not worth doing well"
|
[Date Prev] | [Thread Prev] | [Thread Next] | [Date Next] -- [Date Index] | [Thread Index] | [List Home]