[Date Prev] | [Thread Prev] | [Thread Next] | [Date Next] -- [Date Index] | [Thread Index] | [List Home]
Subject: RE: [energyinterop] [OASIS Issue Tracker] Updated:(ENERGYINTEROP-205) Line 721: testEvent should be expanded from Boolean toallow for indication of other types of Events: Advanced (Normal), Immediate,Audit/Test.
What I *imagine* is that the TC will require that WD18 incorporate 2 out of 7 comments from Jira before public review. That will produce WD18. Based upon that direction from the TC, we can move to accept WD18 as CD (Committee Draft) 01. OASIS Staff will perform certain sorts of quality control on CD01 to result in PR01 (Public Review). <wheuww /> tc "It is the theory that decides what can be observed." - Albert Einstein Toby Considine Chair, OASIS oBIX Technical Committee U.S. National Inst. of Standards and Tech. Smart Grid Architecture Committee Facilities Technology Office University of North Carolina Chapel Hill, NC Email: Toby.Considine@ unc.edu Phone: (919)962-9073 http://www.oasis-open.org blog: www.NewDaedalus.com -----Original Message----- From: Bruce Bartell [mailto:bbartell@xtensible.net] Sent: Tuesday, November 23, 2010 2:27 PM To: OASIS Issues Tracker; energyinterop@lists.oasis-open.org Subject: RE: [energyinterop] [OASIS Issue Tracker] Updated: (ENERGYINTEROP-205) Line 721: testEvent should be expanded from Boolean to allow for indication of other types of Events: Advanced (Normal), Immediate, Audit/Test. Not sure I understand the reference to WD18. Is that a draft to be available before or after the next EI TC meeting? Bruce Bartell Xtensible Solutions Mobile: +1.321.258.6500 bbartell@xtensible.net | www.xtensible.net -----Original Message----- From: OASIS Issues Tracker [mailto:workgroup_mailer@lists.oasis-open.org] Sent: Tuesday, November 23, 2010 10:52 AM To: energyinterop@lists.oasis-open.org Subject: [energyinterop] [OASIS Issue Tracker] Updated: (ENERGYINTEROP-205) Line 721: testEvent should be expanded from Boolean to allow for indication of other types of Events: Advanced (Normal), Immediate, Audit/Test. [ http://tools.oasis-open.org/issues/browse/ENERGYINTEROP-205?page=com.atl assian.jira.plugin.system.issuetabpanels:all-tabpanel ] William Cox updated ENERGYINTEROP-205: -------------------------------------- Fix Version/s: wd18 (was: wd17) > Line 721: testEvent should be expanded from Boolean to allow for indication of other types of Events: Advanced (Normal), Immediate, Audit/Test. > ------------------------------------------------------------------------ ----------------------------------------------------------------------- > > Key: ENERGYINTEROP-205 > URL: http://tools.oasis-open.org/issues/browse/ENERGYINTEROP-205 > Project: OASIS Energy Interoperation TC > Issue Type: Improvement > Components: spec > Affects Versions: wd15 > Environment: Bruce Bartell wd15 line 721 wd16 line 809 > Reporter: Bruce Bartell > Assignee: Bruce Bartell > Fix For: wd18 > > -- This message is automatically generated by JIRA. - If you think it was sent incorrectly contact one of the administrators: http://tools.oasis-open.org/issues/secure/Administrators.jspa - For more information on JIRA, see: http://www.atlassian.com/software/jira --------------------------------------------------------------------- To unsubscribe from this mail list, you must leave the OASIS TC that generates this mail. Follow this link to all your TCs in OASIS at: https://www.oasis-open.org/apps/org/workgroup/portal/my_workgroups.php --------------------------------------------------------------------- To unsubscribe from this mail list, you must leave the OASIS TC that generates this mail. Follow this link to all your TCs in OASIS at: https://www.oasis-open.org/apps/org/workgroup/portal/my_workgroups.php
[Date Prev] | [Thread Prev] | [Thread Next] | [Date Next] -- [Date Index] | [Thread Index] | [List Home]