Toby:

 

I believe I agree with lines 6-7 and 11-12 but this description leaves it a bit fuzzy in my mind.  Did you intend to say “EI is recursive, in that a VEN MAY be the interface to a microgrid that is itself managed by the VTN-VEN interactions of EI; in that internal market, the system which exposes a VEN interface to the outside world may expose a VTN interface inside the microgrid.”

 

Line 29-30, I never thought of registering a product that cannot ever be turned off, such as medical equipment in this example.  Interesting thought … but I suppose possible?  This could provide a decent and automated way to locate and manage the existence of these devices.  (Could require certification by some medical organization as qualifying as this type of device.)

 

Line 38, I would view a VEN as a single resource in the logical scheme of things (thus the word “Virtual” in VEN).  If it “withdraws a resource”, I think what you mean is that it changes the amount of resources (e.g. energy) available.  This may or may not be any change (e.g. withdrawal) of a physical resource.  In other words it could represent a variable resource and this is a key part of the concept enabling it to change the amount currently available. (EPRI whitepaper mentions this on page 5).

 

In the example in line 46 in list item 1, I would submit that although I agree that nameplate information for exact identification of assets behind each resource is definitely not supported, it may seem reasonable that a VEN report a minimal set of categories of its resource.  In other words if a VEN is representing a renewable energy resource, that should be known as that may be a key qualifier for a program in which the VTN is participating.  (As noted in the bullet list on page 5 of the EPRI whitepaper)

 

Line 47-48 is an interesting one.  It would seem that the VTN needs to at least know where the VEN resources impact the grid.  Do we intend to limit this to only the grid and not be a specification that supports distribution systems?  It would seem that an instance of the system utilizing EI spec could exist in either case.  But perhaps there was additional discussion around this item that I may have missed?

 

Line 49-50 seems OK noting that the VTN to VEN can be one-to-many (or conversely VEN to VTN is one-to-one) the mentioned audit information should not be needed.

 

Line 51 – did we really need to say this?   Where do we become entangled with information about people to where we need to broach this topic?

 

I’m a bit confused about the last paragraph (line 52-57).  It seems to negate some of the earlier paragraphs.  Also, how do we “support this requirement, but … not include…” (line 53-54)

 

Gale

 

 

 

Gale R. Horst

Electric Power Research Institute (EPRI)
942 Corridor Park Blvd.
Knoxville, TN 37932
Office: 865-218-8078
Cell:   865-368-2603

ghorst@epri.com


From: Considine, Toby (Campus Services IT) [mailto:Toby.Considine@unc.edu]
Sent: Monday, June 20, 2011 10:17 AM
To: energyinterop@lists.oasis-open.org
Subject: [energyinterop] Energy Interop Resources

 

As requested, a preliminary write-up of our Resource discussions. For comments, please use the numbered PDF.

 

Thanks

 

tc

 

 

 Energy Interop Resources 1

(which may, as Ed Cazalet suggested, be misnamed) 2

As defined in the EPRI white paper, all interaction is between the VEN and the VTN. Neither the VEN or 3 the VTN can interact through the other or see past the other. EI is symmetric, in that a given VTN-VEN 4 pair could swap rules for a different market interaction. EI is recursive, in that a VEN MAY be the 5 interface to a microgrid that is itself managed by the VTN-VEN interactions of EI; in that internal market 6 the system which exposes a VEN interface to the outside world may expose a VTN interface. 7

The inner workings of the “internal” microgrid might be by BACnet, or by LONTalk, or by OPC, or by SEP, 8 or by KNX, or by any mix of open and proprietary protocols. The “internal” microgrid might be a 9 municipal utility, an office park, or an industrial site that manages its internal energy using Energy 10 Interoperation. Whatever the communications and interactions of the internal grid, the direct 11 interactions through the exterior-facing VEN are the same: none. 12

Resources as Distinguishable Products 13

During enrollment, a VEN may choose to register one or more products with the VTN. These products 14 are known as Resources. The VTN has no direct interaction with these resources. As in a restaurant, 15 wherein the customer may request published menu items from the waitress, the VTN may transact for 16 published resources from the VEN. Just as the customer is not allowed to fetch food from the kitchen, 17 nor to order off menu meals, so the VTN is not able to interact directly with the systems that underlie 18 each resource, or to request resources that are not registered. 19

The products represented by the resources may be distinguished by any number of characteristics. EMIX 20 product definitions are distinguished by attributes that include schedule, location, and source and 21 responsiveness. Investopedia defines product differentiation thus: 22

It may be as simple as packaging the goods in a creative way, or as elaborate as incorporating 23 new functional features. Sometimes differentiation does not involve changing the product at all, 24 but creating a new advertising campaign or other sales promotions instead. 25

The products represented by EI Resources may be as concrete as an industrial stone crusher or as 26 abstract as an aggregator’s product, “Air Conditioning for the Elderly”. A Resource may be able to 27 respond both up and down, as can a domestic water heater, or have unidirectional gradations of 28 response, as might a thermostat. A VEN may even wish to register Resources for which no response is 29 possible, say, at-home medical equipment. 30

EI makes no assertion as to what might distinguish two products or as to why different resources are 31 registered by the same VEN. EI does not require that all load controlled by a VEN be indicated in 32 resources. There may be market rules that require such “full registration” for all participants, but EI does 33 not. 34

Enrollment and Withdrawal of Resources 35

A VEN MAY choose to enroll a single Resource, and reveal no information about its internal systems. 36

A VEN may have no Resources. Some markets may require that all participants Enroll, even if they are 37 able to provide no resources. A VEN may enroll new Resources and withdraw other Resources. Having 38 withdrawn its Resources, a VEN may again have no enrolled Resources. A VEN with no Resources is 39 unable to participate in VEN-VTN based markets. It is not in scope to define the market rules for VENs 40 without Resources 41

Ancillary Reporting Requirements 42

Some markets may have reporting requirements beyond those defined in Energy Interoperation. Energy 43 Interoperation neither requires these requirements, nor supports them. Examples of such requirements 44 discussed in the Committee include: 45

1. Nameplate information for exact identification of assets behind each Resource 46

2. Location information to identify local distribution effects of Resources exposed by a single VEN 47 that are distributed geographically (if allowed). 48

3. Customer information to enable a third party to audit the market and determine if a single 49 Resources is being sold multiple times 50

4. Demographic information about the people represented by each VEN. 51

 

All such information is outside the scope of Energy Interoperation. To the extent that participant 52 business rules or market rules requires this information, Energy Interoperation will support this 53 requirement, but it will not include or enforce these requirements. (Perhaps this means that we need to 54 have an approval status on each Resource: Pending, Approved, Refused. Perhaps only Resources 55 approved by the VTN can come to market. If so, that Approval is out of scope; it is merely a reflection of 56 an out-of-band Enrollment.) 57