[Date Prev] | [Thread Prev] | [Thread Next] | [Date Next] -- [Date Index] | [Thread Index] | [List Home]
Subject: [OASIS Issue Tracker] Created: (ENERGYINTEROP-505) Suggestedsupplementary optional data classes with additional (optional) data types,detailed below
Suggested supplementary optional data classes with additional (optional) data types, detailed below --------------------------------------------------------------------------------------------------- Key: ENERGYINTEROP-505 URL: http://tools.oasis-open.org/issues/browse/ENERGYINTEROP-505 Project: OASIS Energy Interoperation TC Issue Type: Improvement Components: spec Affects Versions: wd27 Environment: Steffes Reporter: Toby Considine Assignee: Toby Considine In order to provide optimum value and control and to meet the requirements of the ISO/utility, our units are required to send the following power data to the ISO/utility: 1) Regulation Set Point Feedback - a repeat of the control value sent from the ISO/utility, 2) Up Regulation Capacity Available - the up regulation capacity available to the ISO/utility, 3) Down Regulation Capacity Available - the down regulation capacity available to the ISO/utility, 4) Current Regulation Set Point - the regulation service that is currently being provided to the ISO/utility, 5) Baseline Power - the system load that would exist were the system not providing regulation services, 6) Instantaneous Power Flow, and 7) 15-Minute Rolling Average of Power Flow One embodiment of the use of these parameters is outlined in Appendix I: http://lists.oasis-open.org/archives/energyinterop-comment/201108/bin00000.bin. Additionally, new control strategies would allow the ability to provide several energy parameters important to energy storage applications, including: 8) Stored Energy - amount of energy currently stored 9) Target Energy Storage - desired energy storage level 10) Available Energy Storage - capacity available for further energy storage The Energy Interoperation v1.0 specification currently supports two data classes: PowerFeedbackType and EnergyFeedbackType (from Figure 8-8, line 1110 of working draft). Steffes requests that consideration be given to supplement these two data classes with the above-listed 10 parameters as optional data classes within the standard. These data types are necessary to facilitate frequency regulation and other Smart Grid Control for ISO/Utilities. -- This message is automatically generated by JIRA. - If you think it was sent incorrectly contact one of the administrators: http://tools.oasis-open.org/issues/secure/Administrators.jspa - For more information on JIRA, see: http://www.atlassian.com/software/jira
[Date Prev] | [Thread Prev] | [Thread Next] | [Date Next] -- [Date Index] | [Thread Index] | [List Home]