OASIS Mailing List ArchivesView the OASIS mailing list archive below
or browse/search using MarkMail.

 


Help: OASIS Mailing Lists Help | MarkMail Help

energyinterop message

[Date Prev] | [Thread Prev] | [Thread Next] | [Date Next] -- [Date Index] | [Thread Index] | [List Home]


Subject: [OASIS Issue Tracker] (ENERGYINTEROP-719) Power vs Energy


     [ https://issues.oasis-open.org/browse/ENERGYINTEROP-719?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

William Cox updated ENERGYINTEROP-719:
--------------------------------------
    Resolution: 
Section 3.2.1 defines Resource Designator as an extensible enumeration as suggested elsewhere.

Market participants use their own conceptual models which continue to include power, energy, and other resources. The understanding of e.g. delivery rates is typically not separated out.

  was:
Section 3.2.1 defines Resource Designator as an extensible enumeration as suggested elsewhere.

Market participants use their own conceptual models which continue to include power, energy, and other resouirces.


> Power vs Energy
> ---------------
>
>                 Key: ENERGYINTEROP-719
>                 URL: https://issues.oasis-open.org/browse/ENERGYINTEROP-719
>             Project: OASIS Energy Interoperation TC
>          Issue Type: Bug
>          Components: cts
>    Affects Versions: CTSPR01
>         Environment: Horia Pop; Lateral Inc https://lists.oasis-open.org/archives/energyinterop-comment/202112/msg00001.html
>            Reporter: Toby Considine
>            Assignee: Toby Considine
>            Priority: Major
>              Labels: CLARITY, PREREQ
>
> *Power vs Energy*
> In the initial part of the document both power and energy are referred to as acceptable values for a Resource. Given thereÃs an ongoing confusion between power and energy, I believe the TC should not promote both in the standard as acceptable.ÂTo have any practical TE use energy must always be bound to a unit of time and thus a rate of delivery (power). Whether the power should be levelized or follow an acceptable curve within the interval as defined in [EMIX] thatÃs beyond the scope. The resource that an actor tenders, transacts, delivers, and settles is energy. Power is just an attribute of that energy tender, contract, and delivery.
> _[Lines 11,16,17,229]_



--
This message was sent by Atlassian Jira
(v8.3.3#803004)


[Date Prev] | [Thread Prev] | [Thread Next] | [Date Next] -- [Date Index] | [Thread Index] | [List Home]