[Date Prev] | [Thread Prev] | [Thread Next] | [Date Next] -- [Date Index] | [Thread Index] | [List Home]
Subject: Re: [obix-xml] oBIX Scheduling
1. Sorry, priority is 1-9, and 0 means no priority. 1 is the highest
priority. This is an ical construct. 2. No problem on the op name change. 3. Dashes vs camel case - I was trying to preserve the iCal names (obix name = ical property name = xcal element name). 4. I was thinking Vevent and Period type match the parent calendar type. So if the calendar is a bool, then the events and periods would be bools. 5. Period end vs. duration - just passing along the iCal structure. Brian Frank wrote: 15F5A5BEBDC6F74CBF987F0BC90627C902396175@titan.tridium.net" type="cite"> |
[Date Prev] | [Thread Prev] | [Thread Next] | [Date Next] -- [Date Index] | [Thread Index] | [List Home]