Subject: Contractor costing
Hi folks, We really need to close on this issue soon. At our current
rate, I don’t see us doing much of anything for the remainder of the
year. We really need to pick up the pace! Here is the list of tasks that we
have outlined. Let’s please all take a moment and flesh these out so
that we have what we believe to be a complete set of tasks. If you don’t
have any input for this, then please signal your acceptance by emailing as such
to the group. Draft the survey Work with the sub committee members
to draft a survey. The sub committee will approve the survey before the
survey is conducted. -
Survey Phase 1 TC members will be the target of the
first phase. The contractor will conduct the survey with all willing TC
members. -
Phase 1 analysis The contractor will provide analysis
of the survey results and coordinate feedback from the TC on the survey itself. -
Refine the Survey The contractor will edit and refine
the survey based on the feedback from the TC, the analysis of the phase 1
results, and guidance from the sub committee. -
Identify second
phase targets The contractor will coordinate input
from the TC as to likely candidates for the second phase survey. The
subcommittee will approve the final list. -
Survey Phase 2 The contractor will conduct the
survey with representative on both the consumer and producer side of the PKI
industry. -
Report analysis of
results The contractor will report analysis
of the results to the sub committee in a format suitable for reporting to both
the TC as well as the public |