OASIS Mailing List ArchivesView the OASIS mailing list archive below
or browse/search using MarkMail.

 


Help: OASIS Mailing Lists Help | MarkMail Help

plcs message

[Date Prev] | [Thread Prev] | [Thread Next] | [Date Next] -- [Date Index] | [Thread Index] | [List Home]


Subject: Groups - PLCS Meeting 50 Teleconference modified


Updated presentation for PLCS Implementers forum

 -- Mr. Christopher Kreiler


PLCS Meeting 50 Teleconference has been modified by Mr. Christopher Kreiler

Date:  Thursday, 25 February 2010
Time:  03:00pm - 04:30pm GMT

Event Description:
Meeting 50  Teleconference  25 February 2010 - 1600 CET, 1500 UK, 1500 GMT, 1000 US Eastern, and 0700 US Pacific Time - for maximum 90 minutes.  

Dial-in numbers & passcodes:

PARTICIPANTS PIN NUMBER:      499596 #

  Country	Number
France	0805 110 496
Germany	0800 101 4935
Italy	800 985 528
Norway	21033439
Sweden	0200 895 376
USA	1866 874 0924
UK Local Call	0845 144 0023
Std Int Dial In	+44 (0) 1452 542 437

Agenda:
Objective

The principal objectives of this session are to: (1) accept the Task DEX as a Committee Draft and (2) approve the Task DEX committee draft for release for a 15 day public review, in accordance with the relevant OASIS procedures.  It is important that all voting members of the PLCS TC participate in this meeting so that a quorum is achieved, and that the necessary Full Majority vote is achieved.

1.	Welcome by Chair
2.	Roll call  please check your status on attached spreadsheet
3.	Presentation and discussion of PLCS Implementer Forum (Jim Colson)
4.	Introduction of Task DEX changes (Tim Turner / Phil Rutland) 
5.	Vote to accept Task DEX as a Committee Draft (requires positive vote from >50% of all voting members  must be present on call  no proxies)
6.	Vote to submit Task DEX for second public review (requires positive vote from >50% of all voting members  must be present on call  no proxies)
7.	Future meeting schedule, hosts
8.	Any Other Business

 
Reference material from "Governing the OASIS Technical Committee Process"

2.13 TC Voting
TC votes require a Simple Majority Vote to pass, except as noted elsewhere in this Process. All TC ballots requiring a Special Majority Vote for approval must be conducted by the TC Administrator; the TC Chair shall notify the TC Administrator that a motion has been made which requires a Special Majority Vote, and the TC Administrator shall set up and conduct the ballot.
Eligibility: A Member of a TC must have voting rights to make or second a motion, and must have voting rights at the time a ballot is opened in order to vote on that ballot. Every Voting Member of a TC has a single vote. Organizations do not vote in TCs. Proxies shall not be allowed in TC voting.
Electronic Voting: TCs may conduct electronic ballots, either by using the TCs general mail list or the publicly archived electronic voting functionality provided by OASIS. The minimum period allowed for electronic voting shall be seven days; the TC may specify a longer voting period for a particular electronic ballot. Any Specification Ballot conducted as an electronic ballot must permit each voter to choose "yes", "no" or "abstain."
A motion to open an electronic ballot must be made in a TC meeting unless the TC has adopted a standing rule to allow this motion to be made on the TCs general email list. When such a rule has been adopted, motions made on the mail list must also be seconded and discussed on that list.

2.18 Specification Quality
All documents and other files produced by the TC, including specifications at any level of approval, must use the OASIS file naming scheme, and must include the OASIS copyright notice. All document files must be written using the OASIS document authoring templates, which shall be published and maintained by the TC Administrator. The name of any specification may not include any trademarks or service marks not owned by OASIS.
A specification that is approved by the TC at the Public Review Draft, Committee Specification or OASIS Standard level must include a separate section, listing a set of numbered conformance clauses, to which any implementation of the specification must adhere in order to claim conformance to the specification (or any optional portion thereof).
A specification that is approved by the TC at any level must include a list of people who participated in the development of the specification. This list shall be initially compiled by the Chair, and any Member of the TC may add or remove their names from the list by request.
A specification that is approved by the TC at any level must clearly indicate whether each reference in the specification to a document or artifact is a Normative Reference.
Editable formats of all versions of TC documents must be delivered to the TCs document repository. TC Working Drafts may be in any format (i.e. produced by any application). All TC-approved versions of documents (i.e. Committee Drafts, Public Review Drafts, and Committee Specifications) must be delivered to the TCs document repository in the (1) editable source, (2) HTML or XHTML, and (3) PDF formats; and the TC must explicitly designate one of those delivered formats as the authoritative document. Any links published by the TC shall be to the HTML, XHTML and/or PDF formats stored using repositories and domain names owned by OASIS and as approved by the TC Administrator.
All normative computer language definitions that are part of the specification, such as XML instances, schemas and Java(TM) code, including fragments of such, must be well-formed and valid, and must be provided in separate plain text files. Each text file must be referenced from the specification. Where any definition in these separate files disagrees with the definition found in the specification, the definition in the separate file prevails.
A specification may be composed of any number of files of different types, though any such multi-part specification must have a single specification name and version number. Irrespective of the number and status of the constituent parts, the specification as a whole must be approved by a single TC ballot.
Any change made to a specification requires a new version or revision number, except for changes made to (a) the approval status, (b) the date, (c) the URIs of the specification as appropriate, (d) the running header/footer, and (e) any approved Designated Cross-Reference Changes, all of which must be made after the approval of the specification as a Committee Draft, Committee Specification, or OASIS Standard.


Section 3. Standards Approval Process
3.1 Approval of a Committee Draft 
The TC may at any stage during development of a specification approve the specification as a Committee Draft. The approval of a Committee Draft shall require a Full Majority Vote of the TC. The TC may approve a specification, revise it, and re-approve it any number of times as a Committee Draft.
3.2. Public Review
Before the TC can approve its Committee Draft as a Committee Specification the TC must conduct a public review of the work. The decision by the TC to submit the specification for public review requires a Full Majority Vote, and must be accompanied by a recommendation from the TC of external stakeholders who should be notified of the review. The Committee Draft approved to go to review shall be called a Public Review Draft. The public review must be announced by the TC Administrator to the OASIS Membership list and optionally on other public mail lists; the TC Administrator shall at the same time issue a call for IPR disclosure.
Comments from non-TC Members must be collected via the TCs archived public comment facility; comments made through any other means shall not be accepted. The TC must acknowledge the receipt of each comment, track the comments received, and publish to its primary e-mail list the disposition of each comment at the end of the review period.
No changes may be made to the Public Review Draft during a review. If changes are required the specification must be withdrawn from review then resubmitted.
The TC may conduct any number of review cycles (i.e. approval to send a Committee Draft to Public Review, collecting comments, making edits to the specification, etc.). The first public review of a specification must take place for a minimum of 60 days, and any subsequent reviews must be held for a minimum of 15 days. Changes made to a specification after a review must be clearly identified in any subsequent review, and the subsequent review shall be limited in scope to changes made in the previous review. Before starting another review cycle the specification must be re-approved as a Committee Draft and then approved to go to public review by the TC.
If Substantive Changes are made to the specification after the public review, whether as a result of public review comments or from TC Member input, then the TC must conduct another review cycle. The specification may not be considered for approval by the TC as a Committee Specification until it has undergone a review cycle during which it has received no comments that result in Substantive Changes to the specification.
3.3 Approval of a Committee Specification
After the public review of a Public Review Draft the TC may approve the specification as a Committee Specification. If any comments have been received during the most recent Public Review period, that vote may not commence any earlier than 7 days after the last day of that Public Review. The approval of a Committee Specification shall require a Special Majority Vote. The TC Chair shall notify the TC Administrator that the TC is ready to vote on the approval of the specification, and provide to the TC Administrator the location of the editable versions of the specification files. The TC Administrator shall set up and conduct the ballot to approve the Committee Specification.
3.4 Approval of an OASIS Standard
Simultaneously with the approval of a Committee Specification or at a later date, and after three Statements of Use have been presented to the TC, a TC may resolve by Special Majority Vote to submit the Committee Specification to the Membership of OASIS for consideration as an OASIS Standard. Upon resolution of the TC to submit the specification, its Chair shall submit the following items to the TC Administrator:
(a) Links to the approved Committee Specification in the TCs document repository, and any appropriate supplemental documentation for the specification, both of which must be written using the OASIS templates. The specification may not have been changed between its approval as a Committee Specification and its submission to OASIS for consideration as an OASIS Standard, except for the changes on the title page and running footer noting the approval status and date. 
(b) The editable version of all files that are part of the Committee Specification;
(c) Certification by the TC that all schema and XML instances included in the specification, whether by inclusion or reference, including fragments of such, are well formed, and that all expressions are valid;
(d) A clear English-language summary of the specification; 
(e) A statement regarding the relationship of this specification to similar work of other OASIS TCs or other standards developing organizations; 
(f) The Statements of Use presented above; 
(g) The beginning and ending dates of the public review(s), a pointer to the announcement of the public review(s), and a pointer to an account of each of the comments/issues raised during the public review period(s), along with its resolution; 
(h) An account of and results of the voting to approve the specification as a Committee Specification, including the date of the ballot and a pointer to the ballot; 
(i) An account of or pointer to votes and comments received in any earlier attempts to standardize substantially the same specification, together with the originating TCs response to each comment;
(j) A pointer to the publicly visible comments archive for the originating TC; 
(k) A pointer to any minority reports delivered by one or more Members who did not vote in favor of approving the Committee Specification, which report may include statements regarding why the member voted against the specification or that the member believes that Substantive Changes were made which have not gone through public review; or certification by the Chair that no minority reports exist.
The above submission must be made by the 15th of any month to the TC Administrator, who shall have until the end of the month to complete administrative processing and checking for completeness and correctness of the submission. If the submission is incomplete it shall be rejected but may be resubmitted at a later time.
The TC that originated the specification may resolve by Special Majority Vote to withdraw the proposed specification at any point after it is submitted to the TC Administrator for administrative processing and before the start of the voting period. No part of the submission may be changed or altered in any way after being submitted to the TC Administrator, including by Errata or corrigenda. Errata, corrigenda or other changes to a Committee Specification are not permitted after its submission for OASIS Standard approval; if changes are required the Committee Specification must be withdrawn by the TC, edited, re-approved as a Committee Specification, and then may be resubmitted as a proposed OASIS Standard. Proposed changes of any kind to a Committee Draft or Committee Specification may be maintained by a Technical Committee, but do not have any approval status until incorporated into a revised Committee Draft or Committee Specification.
The TC Administrator shall submit the proposal to the OASIS Membership by the first day of the following month. The first 15 days of that month shall be used by the membership to familiarize themselves with the submission. Voting shall start on the 16th of the month. The voting representatives of those OASIS Organizational Members who were members at the beginning of the familiarization period are eligible to vote, and must cast their ballots by the end of the month.
In votes upon proposed OASIS Standards, each OASIS Organizational Member shall be entitled to cast one vote. Votes shall be cast via the publicly archived electronic voting facility supplied by OASIS. Ballots shall be publicly visible during voting and may be changed up until the end of the voting period. The results of a vote on a proposed standard shall be provided to the membership and to the TC no later than seven days following the close of the voting period.
If at the end of the voting period at least 15 percent of the voting OASIS Membership has voted to approve the proposed standard, and if no votes have been cast to disapprove the proposed standard, it shall become an OASIS Standard immediately following the end of the voting period. If negative votes have been cast amounting to 25 percent or more of the votes cast, or if less than 15 percent of the voting OASIS Membership has cast positive votes to approve the proposed standard, the ballot is deemed to have failed and the submission fails.
However, if negative votes are cast amounting to less than 25 percent of the votes that have been cast, the TC shall be notified of the negative votes, after which the TC shall have 30 days to take one of the following actions by Resolution of a Special Majority Vote: (a) request the TC Administrator to approve the specification as submitted despite the negative votes; (b) withdraw the submission entirely; or (c) submit an amended specification, in which case the amended submission shall be considered as if it were a new submission, except that information regarding previous votes and any disposition of comments received in previous votes shall accompany the amended submission. If the originating TC upon notification of negative votes takes no formal action within the 30 days allocated for consideration of the results, then the specification shall not become an OASIS Standard.
Failure of a ballot for any reason shall not prevent a later version of the same specification from being submitted again as specified in this section.
3.5 Approved Errata
A TC may approve a set of Errata to an OASIS Standard as "Approved Errata" to the corrected specification by: 
(a) Adopting the set of proposed corrections as a Committee Draft, in the form of a list of changes, and optionally accompanied by a copy of the original specification text marked to incorporate the proposed changes.
(b) Confirming by Full Majority Vote that the proposed corrections do not constitute a Substantive Change. 
(c) Submitting the proposed corrections for a 15-day public review, and completing that review, pursuant to Section 3.2. 
(d) After the public review, confirming the proposed corrections as Approved Errata by a Full Majority Vote.
Once approved, the Approved Errata shall be with the specification it corrects, in any publication of that specification. Disposition of Approved Errata must be identified in the subsequent Public Review Draft of the corrected specification.
A TC may not adopt Approved Errata to an OASIS Standard more than once in any consecutive six-month period.


 
Current member status as of 2010-20-09

First Name	Last Name	Role	Company	Voting Level
Sean	Barker	Voting Member	BAE SYSTEMS plc	1
Howard	Mason	Chair	BAE SYSTEMS plc	1
Trine	Hansen	Voting Member	Det Norske Veritas (DNV)*	1
Fredrik	Larsen	Voting Member	Det Norske Veritas (DNV)*	1
Rob	Bodington	Voting Member	Eurostep AB*	1
Jochen	Haenisch	Voting Member	Jotne EPM Technology*	1
Tim	Turner	Voting Member	LSC Group Ltd*	1
Ron	Kolakowski	Voting Member	ManTech Enterprise Integration Center (e-IC)*	1
Christopher	Kreiler	Secretary	ManTech Enterprise Integration Center (e-IC)*	1
Leif	Gyllstrom	Voting Member	Saab AB	1
Mats	Nilsson	Voting Member	Swedish Defence Materiel Administration*	1
Phil	Rutland	Voting Member	UK Ministry of Defence Technical Information*	1
Jerry	Smith	Chair	US Department of Defense (DoD)*	1
James	Colson	Voting Member	USAMC Logistics Support Activity*	1
Scot	Motquin	Voting Member	USAMC Logistics Support Activity*	1
John	Peer	Voting Member	USAMC Logistics Support Activity*	1
			Total	16
				
				
First Name	Last Name	Role	Company	Voting Level
DELAUNAY	Jean-Yves	Member	Airbus	1
Tore	Hartvigsen	Member	Det Norske Veritas (DNV)*	1
Nils	Sandsmark	Member	Det Norske Veritas (DNV)*	1
Peter	Bergstrom	Member	Eurostep AB*	1
Simon	Dick	Member	Eurostep AB*	1
Magnus	Farneland	Member	Eurostep AB*	1
Brad	Harris	Member	Eurostep AB*	1
Torbjorn	Holm	Member	Eurostep AB*	1
Rob	Howard	Member	Eurostep AB*	1
Mattias	Johansson	Member	Eurostep AB*	1
Magnus	Nerman	Member	Eurostep AB*	1
David	Price	Member	Eurostep AB*	1
Jonas	Rosn	Member	Eurostep AB*	1
Nigel	Shaw	Member	Eurostep AB*	1
Krister	Simon	Member	Eurostep AB*	1
Phil	Spiby	Member	Eurostep AB*	1
Vino	Tarandi	Member	Eurostep AB*	1
Mike	Ward	Member	Eurostep AB*	1
Steve	Yates	Member	Eurostep AB*	1
Audun	Bentsen	Member	Jotne EPM Technology*	1
Nicolai	Friis	Member	Jotne EPM Technology*	1
Jorulv	Rangnes	Member	Jotne EPM Technology*	1
Stephen	Foster	Member	LSC Group Ltd*	1
Timothy	King	Member	LSC Group Ltd*	1
Ann	Meads	Member	LSC Group Ltd*	1
Nigel	Newling	Member	LSC Group Ltd*	1
Ian	Sloss	Member	LSC Group Ltd*	1
Tor Arne	Irgens	Member	Norwegian Defence Logistics Organization*	1
Adrian	Blenkiron	Member	Rolls-Royce plc*	1
Carolyn	Cox	Member	Rolls-Royce plc*	1
Carl	Wilen	Member	Saab AB	1
Mats	Elgh	Member	Swedish Defence Materiel Administration*	1
Tom	Hendrix	Member	The Boeing Company*	1
Andy	Burden	Member	UK Ministry of Defence Technical Information*	1
Martin	Gibson	Member	UK Ministry of Defence Technical Information*	1
Steven	Lapsley	Member	UK Ministry of Defence Technical Information*	1
Tim	Carpenter	Member	US Department of Defense (DoD)*	1
Raj	Iyer	Member	US Department of Defense (DoD)*	1
Bryant	Allen	Member	USAMC Logistics Support Activity*	1
			Total	39
				
				
First Name	Last Name	Role	Company	Voting Level
Mary	McRae	OASIS Staff Contact	OASIS *	1
Diana	Helander	Observer	Adobe Systems	1
laurent	bonet	Observer	Airbus	1
hugues	caubel	Observer	Airbus	1
Franck	DULUC	Observer	Airbus	1
Kalle	Hagstrom	Observer	BAE SYSTEMS plc	1
Roger	Ljung	Observer	BAE SYSTEMS plc	1
Thomas	Malloy	Observer	BAE SYSTEMS plc	1
Jan	Ohman	Observer	BAE SYSTEMS plc	1
William	Burkett	Observer	Booz Allen Hamilton*	1
Amit	Pandey	Observer	Capgemini	1
Terrance	David	Observer	Cisco Systems, Inc.*	1
Haakon	Knudsen	Observer	Det Norske Veritas (DNV)*	1
Atle	Kvalheim	Observer	Det Norske Veritas (DNV)*	1
Leif	Tonning	Observer	Det Norske Veritas (DNV)*	1
Boye	Tranum	Observer	Det Norske Veritas (DNV)*	1
Masaru	Suzuki	Observer	Electronic Commerce Promotion Council of Japan	1
Andrew	Vernon	Observer	Epitomy Solutions Ltd.	1
Kasper	Rasmussen	Observer	IBM	1
Cobus	Wasserman	Observer	IBM	1
Robert	Black*	Observer	Individual	1
Kjell	Bengtsson	Observer	Jotne EPM Technology*	1
James	Martin	Observer	Jotne EPM Technology*	1
Timothy	Boland	Observer	Lockheed Martin*	1
Mike	Erickson	Observer	Lockheed Martin*	1
Paul	Kingswood	Observer	Lockheed Martin*	1
Robert	McBride	Observer	Lockheed Martin*	1
Pamela	Rooney	Observer	Lockheed Martin*	1
James	Nyambayo	Observer	LSC Group Ltd*	1
Malcolm	Regler	Observer	LSC Group Ltd*	1
Andrew	Rorison	Observer	LSC Group Ltd*	1
Colin	Tweedie	Observer	LSC Group Ltd*	1
Dale	Kauffman	Observer	ManTech Enterprise Integration Center (e-IC)*	1
Mark	Persinger	Observer	ManTech Enterprise Integration Center (e-IC)*	1
Sandy	TeWalt	Observer	ManTech Enterprise Integration Center (e-IC)*	1
Vebjorn	Smaberg	Observer	Norwegian Defence Logistics Organization*	1
Ragnar	Underland	Observer	Norwegian Defence Logistics Organization*	1
Jorn	Vang	Observer	Norwegian Defence Logistics Organization*	1
James Bryce	Clark	Observer	OASIS *	1
Robin	Cover	Observer	OASIS *	1
Mike	Day	Observer	Rolls-Royce plc*	1
Jan	Andersson	Observer	Saab AB	1
Johan	Carlson	Observer	Saab AB	1
Goran	Rydman	Observer	Saab AB	1
Johannes	Kjellstrm	Observer	Siemens AG	1
Joed	Dougherty	Observer	The Boeing Company*	1
Kevin	Hendricks	Observer	The Boeing Company*	1
David	McCoy	Observer	The Boeing Company*	1
Joe	Phelan	Observer	The Boeing Company*	1
Rob	Austen	Observer	UK Ministry of Defence Technical Information*	1
Tony	Hickish	Observer	UK Ministry of Defence Technical Information*	1
John	Lawless	Observer	UK Ministry of Defence Technical Information*	1
Alex	McNicoll	Observer	UK Ministry of Defence Technical Information*	1
Richard	Brewer	Observer	US Department of Defense (DoD)*	1
Steven	Stelk	Observer	USAMC Logistics Support Activity*	1
			Total	55
				
			Grand Total	110

Minutes:


View event details:
http://www.oasis-open.org/apps/org/workgroup/plcs/event.php?event_id=26521

PLEASE NOTE:  If the above link does not work for you, your email
application may be breaking the link into two pieces.  You may be able to
copy and paste the entire link address into the address field of your web
browser.

Referenced Items
Date            Name                             Type
----            ----                             ----
2010-02-20      PLCS-IF_from_Whitepaper_Update (3).pptReference Document
2010-02-12      BCR1_issues_disposition.xls-2010-02-11.zipReference Document
2010-02-12      OASIS_R2_publication.zip         Reference Document
2010-02-15      Agenda_Meeting_50_20100225_Rev2.docDocument
BEGIN:VCALENDAR
METHOD:PUBLISH
VERSION:2.0
PRODID:-//Kavi Corporation//NONSGML Kavi Groups//EN
X-WR-CALNAME:My Calendar
BEGIN:VEVENT
CATEGORIES:MEETING
STATUS:TENTATIVE
DTSTAMP:20100220T000000Z
DTSTART:20100225T150000Z
DTEND:20100225T163000Z
SEQUENCE:10
SUMMARY:PLCS Meeting 50 Teleconference
DESCRIPTION:Meeting 50  Teleconference  25 February 2010 - 1600 CET\, 1500 UK\,
  1500 GMT\, 1000 US Eastern\, and 0700 US Pacific Time - for maximum 90
  minutes.  \n\nDial-in numbers & passcodes:\n\nPARTICIPANTS PIN NUMBER:
       499596 #\n\n  Country	Number\nFrance	0805 110 496\nGermany	0800
  101 4935\nItaly	800 985 528\nNorway	21033439\nSweden	0200 895
  376\nUSA	1866 874 0924\nUK Local Call	0845 144 0023\nStd Int Dial
  In	+44 (0) 1452 542 437\n\nGroup: OASIS Product Life Cycle Support
  (PLCS) TC\nCreator: Mr. Christopher Kreiler
URL:http://www.oasis-open.org/apps/org/workgroup/plcs/event.php?event_id=26521
UID:http://www.oasis-open.org/apps/org/workgroup/plcs/event.php?event_id=26521
END:VEVENT
END:VCALENDAR


[Date Prev] | [Thread Prev] | [Thread Next] | [Date Next] -- [Date Index] | [Thread Index] | [List Home]