[Date Prev] | [Thread Prev] | [Thread Next] | [Date Next] -- [Date Index] | [Thread Index] | [Elist Home]
Subject: Use Cases and Requirements -- Strawman Draft 2
Attached is a copy of the 2nd straw man version of the use cases and requirements document. It has some fairly significant changes including the following: * Added set of high-level use cases to capture the similarities between many of the scenarios. Maintained a group of detailed use-case scenarios. * Changed diagrams of detailed use case scenarios to use interaction diagrams instead of use case diagrams. * Added a description of each use-case scenario and list of requirements flowing from the scenario. * Added draft glossary (as link). Thanks, Jeff! * Added issues list (as link). Collected from Darren's high-level list and re-formatted. As many issues as have come up on * Gave requirements labelled names for easier reference. * Incorporated and merged requirements list from Core Assertions subcommittee of Oasis Security Services TC (by Philip Hallam-Baker). * Corrected various editorial mistakes. By far, the most text and time have been put into the issues list, and I encourage people -- no, I BESEECH people B-) -- to check that list to make sure that 1) issues they have brought up have been addressed and 2) that the characterization of issues is clear, fair, and accurate. If I was to characterize the lifecycle of our output as a subcommittee, I'd say that we began with an outline and generated a large number of issues. I think that our next step, before the first draft that will go to the main TC, is to resolve these issues and squeeze them back into the main document, as best as possible. We've talked a bit about how to resolve issues on the list. One part is breaking up the issues into digestible chunks -- what the issues list is about -- and posting one email per issue to the list, for response. I think the next part we have to decide is how to -resolve- issues. Perhaps, using Robert's Rules, at some point in the discussion someone can make a motion that we vote on one or more of the potential resolutions for the issue, and we can use the evite voting system to close the items. Another possibility is that someone move that we have consensus and that we resolve the issue without a vote, unless there's an objection. (Crumb, looks like I need to read R's R again). Anyhow, I plan on posting emails for each issue this weekend, to meet the first requirement. I guess we can talk about resolution at the next concall. ~ESP
[Date Prev] | [Thread Prev] | [Thread Next] | [Date Next] -- [Date Index] | [Thread Index] | [Elist Home]
Powered by eList eXpress LLC