[Date Prev] | [Thread Prev] | [Thread Next] | [Date Next] -- [Date Index] | [Thread Index] | [List Home]
Subject: Minutes of Atlantic UBL TC call 30 November 2011
MINUTES OF ATLANTIC UBL TC MEETING WEDNESDAY 30 NOVEMBER 2011 ATTENDANCE Jon Bosak (chair) G. Ken Holman STANDING ITEMS Additions to the calendar: http://ubl.xml.org/events None. Review of Pacific call minutes No comments. NDR WORK GKH: A new checker for NDR rules has been posted: http://lists.oasis-open.org/archives/ubl/201111/msg00020.html This tool lays the groundwork for determining which rules are still relevant and which may no longer be needed. Question: Is the document in progress "UBL 2.1 NDR" or "UBL NDR 2.1"? We observe that the 2.0 version was titled "UBL 2.0 Naming and Design Rules", and the same form has been used for early references to 2.1. AGREED that we should continue to follow precedent and call the version under construction "UBL 2.1 Naming and Design Rules." BUSINESS DOCUMENT ENVELOPE TASK GROUP No news this week. UBL 2.1 PRD3 PSC DELIVERABLES No news this week. UBL 2.1 PRD3 TSC DELIVERABLES See Pacific call for status. SPREADSHEET ISSUES FOR CONTENT SCs See http://lists.oasis-open.org/archives/ubl/201111/msg00017.html http://lists.oasis-open.org/archives/ubl/201111/msg00018.html http://lists.oasis-open.org/archives/ubl/201111/msg00019.html Arianna has dealt with the broken DENs: http://lists.oasis-open.org/archives/ubl/201111/msg00023.html Work remaining to be done: - Providing missing definitions -> PSC and TSC ACTION: JB to contact PSC and TSC. - Correcting absent apostrophes: this is purely editorial and should be a mechanical change, but apparently it will have to be done in eDoCreator. ACTION: JB to contact Arianna. - Same for superfluous newlines in definitions. ACTION: JB to contact Arianna. UBL 2.1 PRD2 COMMENT DISPOSITION See http://lists.oasis-open.org/archives/ubl-comment/201109/msg00000.html http://lists.oasis-open.org/archives/ubl-comment/201109/msg00001.html http://lists.oasis-open.org/archives/ubl-comment/201109/msg00002.html http://lists.oasis-open.org/archives/ubl-comment/201109/msg00003.html From this week's Pacific call: /====================================================================== | AGREED that the only substantive comments received through the | ubl-comment facility regarding PRD2 were contained in msg00002.html | from Mr. João Rodrigues Frade, representing the e-PRIOR project of | the European Commission. These comments were as follows: | | Comment on UBL-DocumentStatus | - The DocumentResponse element should be 0 or 1. If the requested | document does not exist, then no document response will be | returned. | | Comment on UBL-Receipt Advice and UBL-Despatch Advice | - UBL-ReceiptAdvice-2.1 and UBL-DespatchAdvice-2.1, UBL should | provide a message which enables the sender of these messages to | cancel them (once they have been sent). This is quite common in | real life. | | We need dispositions of these comments from PSC and (in the case of | the second comment) from TSC. \====================================================================== Regarding the first comment, we observe that changing the cardinality of DocumentResponse from 1 to 0..1 (i.e., making it optional) does not break backward compatibility, and there is thus no formal reason not to make the change. These issues have already been referred to PSC in a message of 26 September 2011: http://lists.oasis-open.org/archives/ubl-psc/201109/msg00013.html AGREED to request a report on this from PSC and also from TSC with regard to the second comment. ACTION: JB to contact the PSC and TSC. TC CONCALL SCHEDULE Week of 2011.12.05 Regular schedule Week of 2011.12.12 Regular schedule Week of 2011.12.19 Regular schedule Week of 2011.12.26 *** CANCELED *** Week of 2012.01.02 Regular schedule Jon Bosak Chair, OASIS UBL TC ================================================================== TRACKING ITEMS NDR CHECK (NIST TOOL) On hold while working on NDR revision. UBL 2.1 NDR ILLUSTRATIONS UBL 2.0 NDR IMPLEMENTATION GUIDE WIKI http://wiki.oasis-open.org/ubl/NDR_2.0_Implementation_Guide CCTS 2.01 DMR ACTION (2009.06.30): TM to circulate a draft CCTS 2.01 DMR to the TC for review. Pending.
[Date Prev] | [Thread Prev] | [Thread Next] | [Date Next] -- [Date Index] | [Thread Index] | [List Home]