OASIS Mailing List ArchivesView the OASIS mailing list archive below
or browse/search using MarkMail.

 


Help: OASIS Mailing Lists Help | MarkMail Help

ubl message

[Date Prev] | [Thread Prev] | [Thread Next] | [Date Next] -- [Date Index] | [Thread Index] | [List Home]


Subject: Specification submission status


At 2013-02-20 10:35 -0500, I wrote:
MINUTES OF ATLANTIC UBL TC TELECONFERENCE WEDNESDAY 20 FEBRUARY 2013 15:00UTC
...
 1. Does the TC approve as Committee Specification Draft 3 the draft PRD3D5
    found at this URI, instructing the editors to first make the
    non-normative editorial and content changes as follows:

        - changes to title page and package identification as dictated
          by OASIS TC Administration
        - addition of reference to uml/ directory in annex A.3
        - removal of references to css/ and etc/ directories in annex A.3
        - repair of any ASN.1 links in annex G.1
        - addition of asn/ directory content in the distribution

      http://www.oasis-open.org/committees/document.php?document_id=48304

    AGREED (during Pacific call) - all present agreed unanimously
    AGREED (during Atlantic call) - all present agreed unanimously

I am confirming that the only changes made for CSD3 from PRD3D5 are:

  - title page and package identification changes:
    - heading to "Committee Specification Draft 3"
    - stage to be "csd3"
    - citation to be CSD3
  - Annex A.3 - addition of uml/ directory
  - Annex A.3 - removal of css/ and etc/ directories
  - Annex G.1 - the link to the source of the ASN.1 HTML is removed because
                the tool creating it is no longer publicly available
              - the directory is updated per this contribution:
     https://lists.oasis-open.org/archives/ubl-comment/201302/msg00000.html
  - note that the package generation necessarily adds stage information
    and creation date/time stamps in many of the documents resulting in
    character-level differences in the files, though these changes are only
    in the comments sections of the XSD schema documents

The CSD3 package that is about to be delivered to OASIS TC Administration is:

    http://www.oasis-open.org/committees/document.php?document_id=48368

 2. Does the TC approve submitting the approved Committee Specification Draft
    3 for a 15-day public review?

    AGREED (during Pacific call) - all present agreed unanimously
    AGREED (during Atlantic call) - all present agreed unanimously

I am confirming that the only changes made for PRD3 from CSD3 are:

  - title page and package identification changes:
    - heading to "Public Review Draft 3"
    - stage to be "prd3"
    - citation to be PRD3
  - note that the package generation necessarily adds stage information
    and creation date/time stamps in many of the documents resulting in
    character-level differences in the files, though these changes are only
    in the comments sections of the XSD schema documents

The PRD3 package that is about to be delivered to OASIS TC Administration is:

    http://www.oasis-open.org/committees/document.php?document_id=48369

I am informed that each act of submitting a package for review will trigger a post to the TC list confirming the submission.

Note that the differences from UBL 2.0 to UBL 2.1 and the differences from PRD2 to PRD3 are found in the specification in annexes B.3.4 and B.3.5, respectively.

Please let me know if you have any questions.

. . . . . . . . Ken

--
Public XSLT, XSL-FO, UBL and code list classes in Europe -- Apr 2013 |
Contact us for world-wide XML consulting and instructor-led training |
Free 5-hour lecture: http://www.CraneSoftwrights.com/links/udemy.htm |
Crane Softwrights Ltd.            http://www.CraneSoftwrights.com/o/ |
G. Ken Holman                   mailto:gkholman@CraneSoftwrights.com |
Google+ profile: https://plus.google.com/116832879756988317389/about |
Legal business disclaimers:    http://www.CraneSoftwrights.com/legal |



[Date Prev] | [Thread Prev] | [Thread Next] | [Date Next] -- [Date Index] | [Thread Index] | [List Home]