[Date Prev] | [Thread Prev] | [Thread Next] | [Date Next] -- [Date Index] | [Thread Index] | [List Home]
Subject: MINUTES Meeting 10 Jul 2014
---------------------------------------- DRAFT MINUTES OASIS WS-BRSP TC Meeting 10 July 2014, 11:00am to noon PDT ---------------------------------------- Scribe: Gershon Janssen, Jacques Durand 0. Call to Order and roll call Jacques Durand calls the meeting to order and welcomes everyone. * Roll call: Gershon Janssen Jacques Durand Tom Rutt Pim Van Der Eijk Tom Link (observer) Excused: Alessio Soldano Ram Jeyaraman Doug Davis This meeting is quorate. 1. Administrative 1.a- Minutes May 29 meeting: The May 29 minutes as available at https://lists.oasis-open.org/archives/ws-brsp/201406/msg00000.html are approved by unanimous consent. 1.b- BP12, BP20, RSP10, next steps after CS approval * Committee Specifications BP12, BP20 and RSP10 have been published Our Committee Specifications BP12, BP20 and RSP10 have been published; see: https://lists.oasis-open.org/archives/ws-brsp/201407/msg00001.html - Next step is to move these specifications to OASIS standards. - For this step at least 3 Statements of Use are required. - Jacques will follow-up with possible organizations who can provide such a Statement of Use. AI for Jacques: talk to implenters (MSFT, Oracle, IBM) to get their statements of use of profiles. - Moving these specifications to an OASIS standard requires the TC to setup a ballot. Process for moving to OASIS standard: https://www.oasis-open.org/policies-guidelines/tc-process#OASISstandard The length of the Candidate OASIS Standard public review, if greater than the required 60 days. 1.c- Next meeting(s) schedule: Gershin will set-up a poll. (Aug 14, 21 or 28) NOTE: At time these minutes are written Aug 28, 11amPT is most likely. 2. Follow-up on upgrading BSP11 for later versions of SHA: - see most recent upload of - see the Extensibility point proposal:as of 6/13: https://www.oasis-open.org/apps/org/workgroup/ws-brsp/document.php?document_id=53349 - status on Pim/Ram action item to talk to BSP users to check their preference / interest. Gershon Janssen: - status on Pim/Ram action item to talk to BSP users to check their preference / interest. Jacques (Fujitsu): oE0014 Signature Digest algorithm version of SHA algorithm in use (SHA-1, or one of the SHA-2 algorithms). Gershon Janssen: testing tools are still focused on SHA1 - in new BSP definition proposed, there is a bit of relaxation as SHA-1 is no longer required or recommended. - for BSP we made material changes, so another PR is required - Gershon Janssen: (informal) do we have consensus on moving to a CSD and subsequent PR? MOTION: : the current BSP1.1 upgrade proposed in: https://www.oasis-open.org/apps/org/workgroup/ws-brsp/document.php?document_id=53349 is acceptable for progressing further BSP1.1 as a committee specification, and direct the chair to prepare a package ready for balloting as CSD + PR candidate. -TomR moves, Gershon seconds. motion carried by unanimous consent. Gershon Janssen: process the TC agreed on: Gershon Janssen: 1. feel temperature with other TC members not present otday Gershon Janssen: 2. get statements of use Gershon Janssen: 3. decide on moving CS to OS for BP12, BP20, RSP10 with or without BSP Gershon Janssen: 4. motions to resolve this and be able to take next steps. Gershon Janssen: 5. prepare various motions for next meeting so we can pick to appropriate ones. NOTE: At time these minutes are written Aug 28, 11amPT is most likely. |
[Date Prev] | [Thread Prev] | [Thread Next] | [Date Next] -- [Date Index] | [Thread Index] | [List Home]