[Date Prev] | [Thread Prev] | [Thread Next] | [Date Next] -- [Date Index] | [Thread Index] | [List Home]
Subject: [OASIS Issue Tracker] (WSCALENDAR-555) Gluon as Handle and Service Entry Point (SEP)
[ https://issues.oasis-open.org/browse/WSCALENDAR-555?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ] William Cox updated WSCALENDAR-555: ----------------------------------- Resolution: (As in Proposal) Add to 4.5.2 after line 419: More generally, a Gluon can be thought of as a pointer into a Sequence, which is a time-related set of intervals. With Gluons and inheritance rules, missing scheduling information can be dynamically included in a Sequence. If one considers the unscheduled Sequence and referencing Gluons as a subroutine or template, than a Gluon defines an instance or invocation of that template. Several Gluons MAY exist (and be advertised) pointing into a given Sequence. When used in this manner, effectively each Gluon acts as a Service Entry Point for interacting with that template Each Gluon (service entry point) may in turn be associated with additional information: a different price, a different schedule of availability, and so on. Alternately, a Gluon makes the entire instance associated with each entry point actionable by Scheduling that Sequence. (See Table 3-1). If a Gluon includes Recurrence, that Recurrences is not inherited by the Sequence. Rather the sequence is invoked multiple times in accord with the rules of Recurrence. As an example, consider a Sequence that lacks only a StartDateTime to be Scheduled. Recurrence in the Gluon would define an array of StartDateTimes. The result can be computed by Scheduling that Sequence N times, once with each element in that array. > Gluon as Handle and Service Entry Point (SEP) > --------------------------------------------- > > Key: WSCALENDAR-555 > URL: https://issues.oasis-open.org/browse/WSCALENDAR-555 > Project: OASIS Web Services Calendar (WS-Calendar) TC > Issue Type: Improvement > Components: PIM > Affects Versions: PIM CS01 > Environment: Toby Considine > Reporter: Toby Considine > Assignee: Toby Considine > Fix For: PIM WD15 > > > See WSCALENDAR-506 which applied to earlier PIM WD05. That item has been closed, no action. > This applies to PIM CS01 Section 4.5.2 line 415. -- This message was sent by Atlassian JIRA (v6.2.2#6258)
[Date Prev] | [Thread Prev] | [Thread Next] | [Date Next] -- [Date Index] | [Thread Index] | [List Home]