[Date Prev] | [Thread Prev] | [Thread Next] | [Date Next] -- [Date Index] | [Thread Index] | [List Home]
Subject: RE: [ws-sx] WS-SX TC Minutes, May 30 2007
I checked. It is in the schema. See here: http://docs.oasis-open.org/ws-sx/ws-securitypolicy/200702/ws-securitypolicy-1.2.xsd
From: Rich Levinson
[mailto:rich.levinson@oracle.com] Greg, i123 - Example 2.1.1.2 Rich: don’t understand the issue. It seem
to state that there needs to be a NULL passwd assertion, which is missing, but
there is a NULL password assertion in the example. Clarification: The example is wrong
because there is no NULL password element in the SP schema, therefore the
example is invalid. AI: Marc Goodner will analyze the
discrepancy and report back to the TC. Issue remains active.
WS-SX
TC Minutes, May 30 2007 Summary
of new Action Items: Chairs:
Make sure next weeks call is cancelled. Marc
Goodner: Analyze schema/example discrepancy described in issue i123 and report
back to TC Marc
Goodner: Find previous discussion/resolution related to active issue i134 and
report back to TC 1.
Call to order/roll call Status
change: TBD
when Kelvin/Abbie return. Present: Will
Hopkins BEA Systems, Inc. Hal
Lockhart BEA Systems, Inc Corinna
Witt BEA Systems, Inc. Toshihiro
Nishimura Fujitsu Limited* Greg
Whitehead Hewlett-Packard* Henry
(Hyenvui) Chung IBM Michael
McIntosh IBM Anthony
Nadalin IBM Bruce
Rich IBM Mike
Lyons Layer 7 Technologies Inc.* Jan
Alexander Microsoft Corporation Greg
Carpenter Microsoft Corporation Colleen
Evans Microsoft Corporation Vijay
Gajjala Microsoft Corporation Marc
Goodner Microsoft Corporation Chris
Kaler Microsoft Corporation Lloyd
Burch Novell* Steve
Carter Novell* Rich
Levinson Oracle Corporation Ashok
Malhotra Oracle Corporation Prateek
Mishra Oracle Corporation Martin
Raepple SAP AG* Don
Adams TIBCO Software Inc. 2.
Reading/Approving minutes of last meeting (May 16) Adopted
unanimously. 3.
TC Logistics (10 minutes or less) Continue
bi-weekly calls. Make sure next weeks call is cancelled 4.
Security Policy standard ballot status No
Issues with the submission. Expect OASIS member familiarization/ballot to
proceed as planned. 5.
Issues list a)
Review of action items AI-2007-04-18-03
- Greg Carpenter will log new issues to ensure that the TC revisits normative
language usage in the next revision of specs. AI-2007-05-15-02
- Add additional Bridge access numbers to the web site and agendas AI-2007-05-15-03
- Editors will create draft errata docs for SX specs using the WSS errata
documents as a template b)
Issues in Review status i124
- Example 2.1.1.3 Status
changed to Closed i125
- Example 2.1.2.1 Status
changed to Closed i126
- Example 2.1.3 Status
changed to Closed i127
- Example 2.1.4 Status
changed to Closed i128
- Example 2.2.1 Status
changed to Closed i129
- Example 2.2.3 and 2.2.4, Trust10 should be changed to Trust13 Status
changed to Closed i133
- Example 2.1.1.1 Status
changed to Closed c)
New issues i134
- Policy Assertion Parameters and alternatives AI
– Marc to look for previous disussion and reolution and post to list. Issue
remains Active. ER004
- Wrong Security Context Token assertion in example Assigned
to editors. Status changed to Pending. d)
Active issues i123
- Example 2.1.1.2 Rich:
don’t understand the issue. It seem to state that there needs to be a NULL
passwd assertion, which is missing, but there is a NULL password assertion in
the example. Clarification:
The example is wrong because there is no NULL password element in the SP
schema, therefore the example is invalid. AI:
Marc Goodner will analyze the discrepancy and report back to the TC. Issue
remains active. i130
- Example 2.3.2.1 Rich:
Issue makes no sense against issue 2.3.2.1. It does make sense against example
2.3.1.2. I Assume that this is a typo Tony
Nadalin: Need more time to look into this Issue
remains active ER001
- Inconsistent IncludeToken URI between spec and schema xsd file Assigned
to editors. Status changed to Pending ER002
- Editorial comments on SP Assigned
to editors. Status changed to Pending ER003
- Clarification of policy usage for derived keys in SC Assigned
to editors. Status changed to Pending f)
Pending issues
None. 6.
Continue discussion of SP examples document IBM
is doing more testing. Prateek:
follow protocol, close open issues, conduct CD vote. Tony
Nadalin: IBM would vote against going to CD and question whether all the
examples are in scope. Hal:
not sure how you can say some examples are OK and not others. Rich:
Most of the examples are based on previous interop. Tony
Nadalin: Disagree. We had to write new interop code to test these. Further
discussion taken to the list scoped to the following three discussion points.
7.
AOB None 8.
Adjournment |
[Date Prev] | [Thread Prev] | [Thread Next] | [Date Next] -- [Date Index] | [Thread Index] | [List Home]