Subject: More interop doc suggestions
- From: Doug Davis <dug@us.ibm.com>
- To: ws-tx@lists.oasis-open.org
- Date: Wed, 28 Jun 2006 14:42:11 -0400
In section 1.1
- replace "workshop" with
"f2f" - text is old from the pre-oasis workshops process
- line 14 - we're doing "online"
testing, not "f2f"
- principle 4 - should mention SSL instead
of SC/Trust - although nothing in the doc talks about SSL either :-(
- remove the list of scenarios since
people should try all of them :-)
- see suggested version at end of the
note.
scenario 2.1 - init step 3: s/one
way/app/ to match the other scenarios
scenario 3.1 - success criteria - remove
the part about Rollback being received twice - its just once
scenario 5.6 - say that its the PA that
drops the Committed msg - we need to be clear on which side does it
thanks
-Doug
Suggested version of text for Scope
section:
...
Protocol Interoperability testing includes
any message exchange that leverages the protocol. Following the workshop
model, there are two concurrent mechanisms vendors can use to achieve interoperability:
face-to-face(f2f) interop events and online interop testing. Given the
time constraints for test execution during a f2f and the number of participants,
it is important to prioritize tests to select only those focused on mainline
scenarios and which most heavily exercise the protocol. The rest of the
protocol testing can be left for online interoperability and in-house QA
by each vendor.
We propose the following principles for test
selection for online AT interop testing:
- Positive tests only. The failure
scenarios used in testing MUST not include invalid states/invalid messages
by implementations.
- Target Interaction. Test Scenarios
should verify the interaction between two parties according to the protocol.
- Target Protocol. Target scenarios
described by WS-AT and WS-Coordination specifications.
- Include composition with SSL
During the interop event it is recommended
to start with the following scenarios:...