[Date Prev] | [Thread Prev] | [Thread Next] | [Date Next] -- [Date Index] | [Thread Index] | [Elist Home]
Subject: [wsia][wsia-requirements][R900]
R900 [Functional] This specification should make it possible for a user interaction (page navigation and form submission) with a Presentation Fragment (which is assumed to have been generated by a Producer and presented to an end-user by a Consumer) to be routed to the Consumer, and then delegated to the Producer. In this document, such user interaction is named Action. Rewrite: SR, MM, AK. Note: for this to happen, URLs need to be rewritten - it should be possible to redirect actions to the Consumer and then back to the Producer that sourced the markup causing the invocation. I think this needs to be two separate requirements, mirroring each other. I'm not sure it's useful to introduce the term Action: R900 [Functional] This specification should make it possible for a user interaction with the generated presentation to be routed to the Consumer and optionally delegated to the Producer. R900A [Functional] This specification should make it possible for a user interaction with the generated presentation to be routed directly to the Producer, bypassing the Consumer.
[Date Prev] | [Thread Prev] | [Thread Next] | [Date Next] -- [Date Index] | [Thread Index] | [Elist Home]
Powered by eList eXpress LLC