OASIS Mailing List ArchivesView the OASIS mailing list archive below
or browse/search using MarkMail.

 


Help: OASIS Mailing Lists Help | MarkMail Help

ffm message

[Date Prev] | [Thread Prev] | [Thread Next] | [Date Next] -- [Date Index] | [Thread Index] | [List Home]


Subject: FFM TC, September 5 2011, Meeting Minutes


FFM TC, September 5, 2011
Meeting Minutes

 

1. Roll Call & Agenda Review.

Roll call results are available in the following document.

http://www.oasis-open.org/committees/download.php/43430/FFMTC%20roster_roll_call.xlsx

Quorum is present.

 

Agenda was agreed unanimously.

 

2. Volunteer for minutes.

- Sept 5: Juha

- Sept 12: ?

- Sept 19: Israel

- Oct 3:?

- Oct 17: ?

3. Approval of minutes from last meetings:

FFM TC, Aug 22, Meeting Minutes

http://www.oasis-open.org/apps/org/workgroup/ffm/email/archives/201108/msg00021.html

Meeting Minutes were approved.

4: Action Items:

Closed Action Items

Jiri and Israel: Propose solutions to Section 6 issues (see comments under 6 FFMII Specification). Result: See Agenda Item 6C.

Johannes: Check domain model material against the new Work Request status model and propose required changes. Result: See Agenda Item 6E

Missing foundation material to be produced and proposed:
5.1.3 Schedule: Israel: Result: See Agenda Item 6E
5.3 Work Request Status Change Notification: Thinh: leave open. Next
5.4 Field-Initiated Requests: Jiri: Result: See Agenda Item 6f

Jiri and Johannes:
Initial draft material for Core Data Model: Result: See Agenda Item 6a

Open Action Items

5.3 Work Request Status Change Notification: Thinh: left open

New Action Items on September 5, due September 12th.

Juha: propose better wording for most specific translation of 4.5.1 of FFMIISpecification-Foundation-CoreDataModel-20110825-D

Israel: XML format for date/time exists. Israel investigates if it’s ideas could be applied to represent DateTime, Date and Time core data types.

Jiri: Core Data Model: Explain M/O (Mandatory / option). Add this to ‘Conventions’ Section.

Jiri: Core Data Model: reword custom properties to emphasize bilateral applicability (not only towards Implementation)

Jiri & Thinh:  FFMII-Specification-Foundation-20110826-v1.0-wd01--architecture-upd1. Ordering (restructuring) and other edits, Thinh will integrate the result into working draft.

5. FFMII Requirements:

5a) FFMII-BusinessUseCasesFeaturesREQ-v1.0-wd01-08222011.docx. Source: Thinh/NSN

http://www.oasis-open.org/committees/download.php/43410/FFMII-BusinessUseCasesFeaturesREQ-v1.0-wd01-08222011.docx

Proposed changes were accepted. Discussed the need to define concept Team Leader - not needed in definitions. Thinh went through the document editorially. Changed definition of Task to allow more than one Assignee per task. Changed 6.2.3.2 correspondingly.

Unanimously approved edited document http://www.oasis-open.org/committees/download.php/43429/FFMII-BusinessUseCasesFeaturesREQ-v1.0-wd01.zip as official TC Working draft tier 1. Israel made motion, Johannes seconded.

 

View Document Details:

http://www.oasis-open.org/committees/document.php?document_id=43429

 

Download Document: 

http://www.oasis-open.org/committees/download.php/43429/FFMII-BusinessUseCasesFeaturesREQ-v1.0-wd01.zip

 

TC members shall review the document until next week’s meeting. The plan is to implement any editorial changes, and approve the document for public review.

6. FFMII Specification:

6a) FFMIISpecification-Foundation-CoreDataModel-20110825-D.  Source: Jiri/NSN

http://www.oasis-open.org/committees/download.php/43341/FFMIISpecification-Foundation-CoreDataModel-20110825-D.docx

Document was noted. Decided to integrate content in the Foundation document. Date, Time and DateTime vs DateTime only? This will be re-evaluated in retrospect after the specification has been more fully developed

Explain M/O (Mandatory / option). Add this to ‘Conventions’ Section. (Added Action item for Jiri)

Reword custom properties to emphasize bilateral applicability (not only towards Implementation) (Added Action item for Jiri)

6b) FFMII-Specification-Foundation-20110826-v1.0-wd01. Source: Thinh/NSN

http://www.oasis-open.org/committees/download.php/43352/FFMII-Specification-Foundation-20110826-v1.0-wd01.docx

Document was noted. This document will be used as a basis for further work of the FFM TC.

6c) FFMII-Specification-Foundation-20110826-v1.0-wd01--architecture-upd1. Source: Jiri/NSN

http://www.oasis-open.org/committees/download.php/43366/FFMII-Specification-Foundation-20110826-v1.0-wd01--architecture-upd1.docx

Discussed if Capabilities Discovery should be optional in Manager. There is relatively lot of work to implement a Manager Capabilities discovery if it does not support anything. Therefore it can be left as an optional feature.

TC agreed on revised draft. Ordering (restructuring) proposed by Jiri was accepted. Jiri makes edits, Thinh will integrate the result into working draft (added Action item to Jiri & Thinh).

TC Stopped meeting after this item 6c.  

6D-6F remain on next meeting’s agenda, 12.9.

6d)  Domain Model: Schedule - proposed definition. Source: Israel/ClickSoftware

http://www.oasis-open.org/apps/org/workgroup/ffm/email/archives/201109/msg00000.html

6e) FFMII-Specification-Foundation-20110826-v1.0-JL20110905-status.docx; Source Johannes

http://www.oasis-open.org/committees/download.php/43426/FFMII-Specification-Foundation-20110826-v1.0-JL20110905-status.docx

6f) Field Initiated Requests concept (FFMII-Specification-Foundation-20110826-v1.0-wd01--fieldRequest-upd1.docx)

http://www.oasis-open.org/committees/download.php/43427/FFMII-Specification-Foundation-20110826-v1.0-wd01--fieldRequest-upd1.docx

7: Next FFM TC meeting planning:

a)      Next conference calls: Sept 12, Sept 19, Oct 3, Oct 17 @ 8:00 – 10:00 AM, Central Daylight Time (Chicago, GMT-05:00)

b)      Face to face meeting: ??

8. Any other business:

 



[Date Prev] | [Thread Prev] | [Thread Next] | [Date Next] -- [Date Index] | [Thread Index] | [List Home]