[Date Prev] | [Thread Prev] | [Thread Next] | [Date Next] -- [Date Index] | [Thread Index] | [List Home]
Subject: Minutes of Pacific UBL TC call 3|4 August 2009
MINUTES OF PACIFIC UBL TC MEETING TUESDAY 4 AUGUST 2009 ATTENDANCE Jon Bosak (chair) G. Ken Holman Andy Schoka STANDING ITEMS Additions to the calendar: http://ubl.xml.org/events None. Review of Atlantic call minutes No comments. SCHEDULE REVIEW http://lists.oasis-open.org/archives/ubl/200906/msg00026.html TSC (AS): Held meeting last week and continued discussion of Freightwise data models. Expect to hold another work session this week, including a discussion of requirements for new code lists. ACTION: AS to keep TonyC in the loop regarding code list issues. GKH: Spreadsheets? ACTION: JB to ping TM. AS: TSC will not have ss in time for Montréal. GKH: We need summary of the new doc types. ACTION: JB to review current 2.1 doc draft to see what we have. We know that not all doc types have been identified yet. AGREED that we need to add a row in the schedule below current row 15 for "UBL 2.1 Implementation Guidelines." We will need resources to actually accomplish this. ACTION (6/30): TM to circulate a draft CCTS 2.01 DMR to the TC for review. Pending. UBL LATAMLSC FORMATION JB: Have been in correspondence with Kenneth; he will be sending a draft charter for further discussion. UBL 2.1 DOCUMENTATION JB: Will need help setting up the PDF production environment (this is already scheduled for the F2F). CONCEPT OF CODE LIST TEMPLATES FOR UBL 2.1 See http://lists.oasis-open.org/archives/ubl/200907/msg00021.html AGREED that we will include the metadata-only gc files in a separate "templates" directory in the 2.1 package along with an explanation of their possible use. These will not be pointed to from the CVA because they are not participating in validation. This means that for every code list item, there will either be sets of actual codes in the default directory or metadata-only files in the templates directory. (In essence, we are agreeing to GKH's suggestions in the message referenced above with the exception of his suggestion #2, deciding instead to include these files rather than omit them.) The metadata-only files will use the same internal structure used in 2.0, but will be separated into the templates folder rather than mixed in with the others. The location URI will reflect their location in the distribution set. The CEFACT codelists will be moved into the default directory. MONTRÉAL MEETING 17-21 AUGUST 2009 The meeting will be held in the downstairs lounge of the Hotel Europa in Montréal during the week following the Balisage markup conference (http://www.balisage.net/) in the same location. The opening plenary will take place at 09:15 Montréal time Monday 17 August 2009. Call-in information is the same as used for weekly UBL TC calls (see any TC agenda). GKH will host a Yugma session on his machine; an ID will be provided by email at the start of the call. The Montréal meeting marks the completion of outstanding issues and closure of the door to any data model changes till the next public review cycle. Planning to attend in person: JB, GKH, MC, MG, ZR (Mon-Tue) Planning to attend by phone: TM, PLB, AS, BH, TonyC, AH. Specific scheduling items: TM may not be able to attend the opening plenary. GKH will be delivering a 90 minute presentation to a corporate client 1500-1630 Tuesday; the group may wish to attend. We will be scheduling a call 0930 Wednesday 19 August for a work session with Freightwise regarding UBL spreadsheets. People attending in person should plan to meet at 7 p.m. Sunday night 16 August in the lobby of the Europa for dinner. Agenda and work assignments (confirmed participants): Complete UBL 2.0 NDR and prepare for publication (JB, MC, MG; GKH on call for formatting help) Complete UBL 2.0 Guidelines for Customization, including comment review (JB, MC, MG, plus remote participants in plenary) Test schema generation (GKH, Oriol, TonyC) Review initial UBL 2.1 documentation (all) Review data models etc. to identify materials to be added to the document in progress (TM, AS, AH, PLB) 2010 UBL TC MEETING SCHEDULE 8-12 February 2010 in Copenhagen, colocated with a PEPPOL conference 10-11 February. TM to chair. TC CONCALL SCHEDULE Week of 10 Aug 2009: >>> TRAVEL <<< Week of 17 Aug 2009: UBL TC meeting in Montréal Week of 24 Aug 2009: >>> TRAVEL <<< Week of 31 Aug 2009: Regular schedule OTHER BUSINESS AS: What is analogous to the UN/CEFACT data type catalog for defining fundamental data types in UBL? GKH: We use the CCTS 2.01 data types; any of those types are available to us. Jon Bosak Chair, OASIS UBL TC
[Date Prev] | [Thread Prev] | [Thread Next] | [Date Next] -- [Date Index] | [Thread Index] | [List Home]