[Date Prev] | [Thread Prev] | [Thread Next] | [Date Next] -- [Date Index] | [Thread Index] | [List Home]
Subject: Re: Committee Notes
Hi Norm, If it is a TC deliverable, then in order to reach Committee Note status it must first be submitted for a 30-day public review. Mary On Dec 13, 2010, at 11:12 AM, Norman Walsh wrote: > Hi Mary, > > Having official non-standards track, non-normative committee notes clearly > specified in the process is a good idea. But I must be misunderstanding > the intent of Section 3 with respect to Committee Notes. > > Surely if the intent of the TC is to produce a non-normative note, the > informal result of some analysis, for example, or a collection of > examples, it's not necessary for a full-blown member review process. > But that's the way 3.2 reads. Perhaps that section could be clarified. > > If non-normative material requires the same level of review as > normative material, I think that's going to significantly impede the > ability of the TC to produce educational material that directly > benefits the community without imposing any standards burden. > > Be seeing you, > norm > > -- > Norman Walsh <ndw@nwalsh.com> | Through space the universe grasps me > http://nwalsh.com/ | and swallows me up like a speck; > | through thought I grasp it.-- Pascal
[Date Prev] | [Thread Prev] | [Thread Next] | [Date Next] -- [Date Index] | [Thread Index] | [List Home]